Precio FOB
Obtener el precio más reciente33400 ~ 42110 / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
S11-80000/10-0.4
Precio FOB:
33400 ~ 42110 / Set Obtener el precio más reciente
Lugar de origen:
Hengyang
Precio de pedido mínimo:
33400 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
nude packing
El tiempo de entrega:
40-60
Capacidad de suministro:
-
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Ms. Shen
Shigu District Venture Technology Park (Songmutang), Hengyang, Hunan
The power transformer is one of the main
equipments which are used in power plants, substations and power
terminals. The role of the transformer is not only to raise the
voltage of the electric energy to the power supply area, but also
to reduce the voltage to the level of the use of voltage, thus
meeting the needs of electricity. In short, the voltage raise and
drop must be completed by the transformer. In the process of
transmission of electric power system, it is necessary to produce
the loss of voltage and power, and at the time of transmission of
same power, the voltage loss is inversely proportional to the
voltage, and the power loss is inversely proportional to the square
of the voltage. The use of transformer to improve the voltage can
reduce the power loss.
The transformer is composed of two
or more winding coils which are wound on the same core, and the
windings are connected by an alternating magnetic field and work
according to the principle of electromagnetic induction. The
transformer installation location should take account ease of
operation, maintenance and transportation, and should stand at a
safe and reliable place. When the transformer is used, the rated
capacity of the transformer must be selected reasonably. For the
transformer no-load operation, high reactive power will be
required, and the reactive power will be supplied by the power
supply system. If the transformer capacity is too high, not only
the initial investment will be increased, but also the transformer
will be in no-load or light load operation for a long time,
increasing the proportion of no-load loss, reducing the power
factor, increasing network loss, which may cause non-economical or
non-reasonable operation. If the transformer capacity is too low,
the transformer will be involved with long-term overload, which is
easy to cause damage. Therefore, the rated capacity of the
transformer should be selected according to the needs of the
electricity load, neither too high or too low.
País: | China |
N º de Modelo: | S11-80000/10-0.4 |
Precio FOB: | 33400 ~ 42110 / Set Obtener el precio más reciente |
Lugar de origen: | Hengyang |
Precio de pedido mínimo: | 33400 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | nude packing |
El tiempo de entrega: | 40-60 |
Capacidad de suministro: | - |
Tipo de pago: | T/T |
Grupo de productos : | power transformer |