¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Power distribution cabinet
Next

Power distribution cabinet

|

1 Set Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1 Set

Detalle de embalaje:

wooden case or carton

El tiempo de entrega:

2-7days

Capacidad de suministro:

3000 Set per Month

Tipo de pago:

T/T

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. Sherry

NO 21 Huoju North Road Huoju High-tech Zone Huli District Xiamen, Xiamen, Fujian

Contactar ahora

Descripción del producto

Power distribution panel (box), which can be classified as power distribution panel, lightning distribution panel and measuring panel, is the end equipment of power distribution system.It can be divided into three categories: (1) First class power distribution equipment, also known as power distribution center,installed in substation of enterprises to distribute power to lower class distribution equipment(2)Second class power distribution equipment,the general name of power distribution panel and motor control center. (3) Third class 
distribution equipment, generally known as lightning distribution panel, such as GGD ,GCK, GCS, MNS, XLL2 
low-voltage distribution box and XGM low-voltage lighting box.

 Application: apply to any places using electricity.


Sains is able to provide custom control penal/cabinet(PLC panel, VFD panel, Soft Starter Panel, etc.) and can also provide turnkey solution for various industries ranging from oil & gas to manufacturing, waste water to various others.

We have been doing OEM for ABB for around *0 years which ensures our product quality.

We have done many successful cases for many famous companies, such as TOTO(production line control system), Coca cola(Refrigerating Station Control System), Nat Steel(VFD reneation , Ixom(chlorine shutdown system),
Kodak (pure water treatment system), etc.

We promise to present you the design"ation&lead-time in **4 days without charge.
We can design&assemble the control cabinet based on your requirement. 
We promise one year part warranty.
We promise in-time delivery.
Any inquiry is welcomed.

 

País: China
N º de Modelo: -
Precio FOB: Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1 Set
Detalle de embalaje: wooden case or carton
El tiempo de entrega: 2-7days
Capacidad de suministro: 3000 Set per Month
Tipo de pago: T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ms. Sherry < Xiamen Sains Automation System Co., LTD. >

quiero saber: