Precio FOB
Obtener el precio más reciente30 ~ 70 / Square Meter
|200 Square Meter Minimum Order
País:
China
N º de Modelo:
safs
Precio FOB:
30 ~ 70 / Square Meter Obtener el precio más reciente
Lugar de origen:
china
Precio de pedido mínimo:
30 per Square Meter
Cantidad de pedido mínimo:
200 Square Meter
Detalle de embalaje:
Special export packing. Strong enough for sea transportation.
El tiempo de entrega:
45days
Capacidad de suministro:
20000 Short Ton per Month
Tipo de pago:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Grupo de productos :
-
Persona de contacto SAFS
Singapore, Other
1. The steel structure is light in weight, high in strength, and large span. 2. The construction period of steel structures is short, which reduces investment costs accordingly. 3. Steel structure buildings have poor fire resistance and corrosion resistance. Steel structures should not be used in areas with low temperatures. 4. The steel structure building is easy to move and recycle without pollution. 1) Steel structure components will be in nude packaging with proper protection. 2) Sandwich panels will be packed with plastic film. 3) Doors and windows will be packed with bubble plastic. 4) Bolts and other accessories will be packed in wood boxes. Normally is *0HQ and *0OT container. If you have specifical requirements,*0GP and *0GP container are ok. Port QINGDAO PORT/LIANYUNGANG PORT/SHANGHAI PORT Quick and flexible assembly. All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy. Cost- effective. It will significantly shorten the construction period of your buildings, saving a great deal of time and money. High safety and durability. The steel structure has a lightweight but high strength, which is also easy to maintain. It can be utilized for over *0 years. Optimal design. The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance. High utilization. It is easy to move and relocate steel structure, which can also be recycled without pollution. Solid construction. The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has the excellent seismic performance.
País: | China |
N º de Modelo: | safs |
Precio FOB: | 30 ~ 70 / Square Meter Obtener el precio más reciente |
Lugar de origen: | china |
Precio de pedido mínimo: | 30 per Square Meter |
Cantidad de pedido mínimo: | 200 Square Meter |
Detalle de embalaje: | Special export packing. Strong enough for sea transportation. |
El tiempo de entrega: | 45days |
Capacidad de suministro: | 20000 Short Ton per Month |
Tipo de pago: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other |
Grupo de productos : | - |