Precio FOB
Obtener el precio más reciente( Negotiable )
|- Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
-
Detalle de embalaje:
25 kgs bags or according to customer's requirement
El tiempo de entrega:
15 days after order being confirmed
Capacidad de suministro:
-
Tipo de pago:
T/T
Grupo de productos :
-
Persona de contacto Robert
Xianyang, Shaanxi
1. Introduction
In oil field exploration and development
and exploration of geology, water and coal, it is used as adhesive
of well drilling mud raw materials, can improve the service life of
drill bits, improve the drill speed and drilling footage, and
reduce plug in replacing drill, and has prominent well slough
preventing effect, and it can be used as fracturing fluid of oil
fields or plugging agent of controlling profile and plugging
water.
2. Technical index Item Index Sieve residue, %
≤*0 Moisture, % ≤*0 Effective content,% ≥*0
Hydrolyzing degree,% / Intrinsic viscosity number,
ml/g ≥**0 Flocculation time,s ≤*0 burning residue,%
≤4.5
País: | China |
N º de Modelo: | - |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | - |
Detalle de embalaje: | 25 kgs bags or according to customer's requirement |
El tiempo de entrega: | 15 days after order being confirmed |
Capacidad de suministro: | - |
Tipo de pago: | T/T |
Grupo de productos : | - |