Precio FOB
Obtener el precio más reciente|
1 Piece Minimum Order
País:
China
N º de Modelo:
TEC-100, TEC-150, TEC-200, TEC-300
Precio FOB:
Lugar de origen:
Suzhou,Jiangsu,China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
1 PC/Carton with foam
El tiempo de entrega:
25 Days After Deposit or L/C
Capacidad de suministro:
-
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Ms. Christina
Building 19, No.28 Xiexin Road, Longshan Industrial Park, Suzhou New and Hi-tech District (SND), Jia, Suzhou, Jiangsu
Characteristics:
1.Adopt semi-conductor to complete electronic cooling.
2.Mini-shape and light.
3.Without compressor and Freon.Environment-friendly, no vibration, no leak.
4.Use Environment-friendly materials,which meet RoHs requirements.
5.No installation direction limitation.Can be applied to many occasions.
6.Normal working ambient temperature is **0°C to + *0°C.
7.Use high density and thermal insulation foam to fill the cool end and hot end of the cooling equipment.
8.The temperature of overheat protector of radiator at hot end is set at **5°C±5°C.
9.Applicable to the sealed,vibrant,and rotary occasions on which compressor cannot work.
*0.Except for fan,since there are no fatiguing or breaking machine parts,it is the most long-lasting,reliable method of cooling.
*1.Alarm output to monitoring system.
*2.Automatic self start after power recovery.
*3.Proper design for easily installation and service.
*4.Interchangeable and visual display
service adapter.
País: | China |
N º de Modelo: | TEC-100, TEC-150, TEC-200, TEC-300 |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | Suzhou,Jiangsu,China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | 1 PC/Carton with foam |
El tiempo de entrega: | 25 Days After Deposit or L/C |
Capacidad de suministro: | - |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Thermoelectric Cooler |