Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
GSJ65/GSJ75/GSJ90/GSJ120/GSJ150
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
Wood pallet covered by plastic film
El tiempo de entrega:
60 working days since the date of receiving deposi
Capacidad de suministro:
300 Set per Year
Tipo de pago:
T/T
Grupo de productos :
China
Persona de contacto Mr. Felix
Tangshi, Zhangjiagang, Jiangsu
1). High efficiency:(production lineal speed is increased over
2times)
Old line: *0mm(single)—max. *2m/min. *0mm (dual)**-max.
7min/min.
New line *0mm (single)—max. *5m/min. *0mm(dual)**-max. *5m/min.
2). Low power consumption; (save electrical power *0%)
Old design: ****3mm(dual) output **0kg/h, Total power: **3kw
(*0%=**0kw), 0.5kw/kg
New design ****3mm (dual) output **0kg/h Total power: **8kw
(*0%=**0kw) 0.*5kw/kg
3) Less man power (only ½labor cost)
Operate one old design ****3mm line will need 2 operators, they can
produce pipe**0kg/h.
Control one new design line will need 2 operators, too, but they
can produce pipes **0kg/h.
4) High automation system (easy operation)
Adopt German Siemens PLC controlling system, automatical and
intelligent alarm, wake up and heating function.
5) Save **6% materials and high uniform quality of end products
.
Gravimetric dosing unit control the products weight permeter,
reduce the unqualified products and save the raw materials.
País: | China |
N º de Modelo: | GSJ65/GSJ75/GSJ90/GSJ120/GSJ150 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | Wood pallet covered by plastic film |
El tiempo de entrega: | 60 working days since the date of receiving deposi |
Capacidad de suministro: | 300 Set per Year |
Tipo de pago: | T/T |
Grupo de productos : | Extrusion Technology |