¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
OIL Transformer
Prev
OIL Transformer
Next

OIL Transformer

|

1 Set Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1 Set

Detalle de embalaje:

-

El tiempo de entrega:

within 15 days

Capacidad de suministro:

-

Tipo de pago:

T/T, L/C, Western Union

Grupo de productos :

Contactar ahora
Miembro Básico

Persona de contacto Ms. leah

Wenzhou Bridge Industrial Zone, Wenzhou, Zhejiang

Contactar ahora

Especificaciones del producto

Descripción del producto

OIL transformer:

*0KV/*5KV CLASS
Apply for IEC,ANSI,GB.
ISO***1,ISO****1,OHSAS****1, CCC
 

Our Transformer:

 

1. Rated voltage:    6.3kV,*0kV,*1kV,*3.2kV,*3.8kV,*5kV, *0KV, *2KV, *3KV,*5KV

2. Rated capacity:  5kva ~ ****0kva

3. Stardard:           IEC****6,GB********6; 

4. Frequency:       *0HZ /*0HZ

5. Vector group:    Dyn*1, Yyn0, Ynd*1, or others

6. Cooling:            ONAN/ ONAF/ OFAF

 

 

About Our Company:

 

1.  25 years' manufacturing experience with three subsidiaries

2. Won tenders aboard

3. IEC ****6 & ISO certificate

4. OEM / ODM

5. Competitive price with **0% Cu winding

6. Production capacity: *0,**0,**0 kVA per year

 

 

REFERENCES
 
ISO ***1: Hot dip galvanized coatings on fabricated iron and steel articles – Specifications and test methods.
IEC ****6: Power transformers.
IEC ****4: Instrument transformers.
IEC ****6: Specification for unused mineral insulating oil for transformers and switchgear.
IEC ****4: Loading guide for oil – immersed power transformers.
IEC ****4: Tap-changers - Part 1: Performance requirements and test methods, Part 2: Application guide.
IEC ****2: Connectors for electronic equipment.
 
ROUTINE TEST to IEC ****6 (to be done during acceptance testing at factory)
 
• Measurement of winding resistance
• Ratio test
• Vector group
• Separate source voltage withstand test
• Induced over-voltage
• Insulation resistance
• Oil leakage test on fully assembled transformer for *2 hours
• Measurement of impedance voltage
• Magnetic balance
• Measurement of no-load loss and current
• Measurement of load loss (at normal & extreme taps)
• Tests on on-load tap-changer
• Tests on on-load tap-changer remote control panel
• Efficiency at *0%, *5%, **0% loading at unity p.f and rated terminal voltage (Corrected to *5C)
• Lightning impulse withstand test

 

Type Tests to IEC ****6 (to be done during acceptance testing at factory)
 
• Temperature rise test – To be performed on one unit during acceptance testing.
Lightning Impulse Withstand Test is already listed under Routine Tests as per IEC ****6.



 

País: China
N º de Modelo: -
Precio FOB: Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1 Set
Detalle de embalaje: -
El tiempo de entrega: within 15 days
Capacidad de suministro: -
Tipo de pago: T/T, L/C, Western Union
Grupo de productos : Power transformer

Send a direct inquiry to this supplier

A:

Ms. leah < Huanyu Group Co., ltd >

quiero saber: