Precio FOB
Obtener el precio más reciente|
1 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
-
El tiempo de entrega:
within 15 days
Capacidad de suministro:
-
Tipo de pago:
T/T, L/C, Western Union
Grupo de productos :
China
Persona de contacto Ms. leah
Wenzhou Bridge Industrial Zone, Wenzhou, Zhejiang
Our Transformer:
1. Rated voltage: 6.3kV,*0kV,*1kV,*3.2kV,*3.8kV,*5kV, *0KV, *2KV, *3KV,*5KV
2. Rated capacity: 5kva ~ ****0kva
3. Stardard: IEC****6,GB********6;
4. Frequency: *0HZ /*0HZ
5. Vector group: Dyn*1, Yyn0, Ynd*1, or others
6. Cooling: ONAN/ ONAF/ OFAF
About Our Company:
1. 25 years' manufacturing experience with three subsidiaries
2. Won tenders aboard
3. IEC ****6 & ISO certificate
4. OEM / ODM
5. Competitive price with **0% Cu winding
6. Production capacity: *0,**0,**0 kVA per year
REFERENCES
ISO ***1: Hot dip galvanized
coatings on fabricated iron and steel articles – Specifications and
test methods.
IEC ****6: Power
transformers.
IEC ****4: Instrument
transformers.
IEC ****6: Specification for unused
mineral insulating oil for transformers and switchgear.
IEC ****4: Loading guide for oil –
immersed power transformers.
IEC ****4: Tap-changers - Part 1:
Performance requirements and test methods, Part 2: Application
guide.
IEC ****2: Connectors for electronic
equipment.
ROUTINE TEST to IEC ****6 (to be
done during acceptance testing at factory)
• Measurement of winding
resistance
• Ratio test
• Vector group
• Separate source voltage withstand
test
• Induced over-voltage
• Insulation resistance
• Oil leakage test on fully
assembled transformer for *2 hours
• Measurement of impedance
voltage
• Magnetic balance
• Measurement of no-load loss and
current
• Measurement of load loss (at
normal & extreme taps)
• Tests on on-load
tap-changer
• Tests on on-load tap-changer
remote control panel
• Efficiency at *0%, *5%, **0%
loading at unity p.f and rated terminal voltage (Corrected to
*5C)
• Lightning impulse withstand
test
Type Tests to IEC ****6 (to be
done during acceptance testing at factory)
• Temperature rise test – To be
performed on one unit during acceptance testing.
Lightning Impulse Withstand Test is
already listed under Routine Tests as per IEC ****6.
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | - |
El tiempo de entrega: | within 15 days |
Capacidad de suministro: | - |
Tipo de pago: | T/T, L/C, Western Union |
Grupo de productos : | Power transformer |