Precio FOB
Obtener el precio más reciente17000 ~ 27000 USD / Set ( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
HC2156
Precio FOB:
17000 ~ 27000 USD / Set ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
17000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
Exporting packing standard
El tiempo de entrega:
Withiin 7 days after the down payment
Capacidad de suministro:
500 Set per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Zack
Guzhang Industrial Park, Ganzhou, Jiangxi
Description
Mobile gold recovery plant
HC***6 is composed by hopper, rock hammer crusher, sluice box,
gold separator, YC diesel generator, diesel engine, water pump
and combined type frame etc, besides it equip mechanical
leveling device which can support the system firmly, in order
to ensure that gold particles have the optimum separation.
1. Component
element
(1) Crush system The rock hammer crusher driven by *0HP diesel
engine, it can break rock which is not bigger than *0mm to
minus 2.8mm, in that case useful mineral can be completely
liberated from the rock, then flows to gold sluice box which as
rougher for separation.
(2) Rough system
The rougher is a gold sluice box, it's ***0mm length with **0mm
width, it covered by professional gold recovery carpet.
(3) Clean system
The concentrate get from gold sluice box still has impurities,
it should have a re-separation of enrichment for the gold.
Shaking table is an excellent cleaner which can separate gold
perfectly with very low cost. The power is 1.1Kw only.
(4) Water system
The plant adopts an unified water supply system, it can supply
***0 tons per hour, because of low quality of water allowed for
gold separation, so the water can be recycled when it shortage.
The power of water supply system is 1.5kw only.
(5) Gold purify device
Amalgamator can be added on the mobile plant according to
customer's demand.
(6) Mobile device Whole plant move by wheels, and fix on the
ground by mechanical leveling supports when it working.
2
Application
Feed raw ore which is not bigger than *0mm into the rock hammer
crusher by hand. The crushed ore with water flows into gold
sluice box directly, the carpet on the gold sluice box can
catch all heavy particles, moreover light particles flow away
with water because of gradient. Clean those heavy particles
from the carpet and put into shaking table by hand for gold
separation.
Nowadays conditions of the majority of rock gold mining become
worse to worse, large-scale mining machine is limited by the
condition, mobile gold recovery plant is an excellent solution
for small scale miners, because it's flexible, convenient,
movable, low cost and high recovery, it apply to small scale
mining of rock gold or placer gold.
3
Operation
(1) Try to find a place where is near water source and
relatively flat, put the mechanical leveling supports down
until all wheels hang in the air, adjust leveling support to
ensure the operating platform is level. Take water pump to the
water source, check whether the pipe is connected. Start the
engine on.
(2) Feed raw ore into crusher equably and stably, check slurry
out from bottom of crusher whether it's unblocked, control the
water ensure to get best concentration for the slurry. In order
to have higher recovery, recommend that clean the carpet every
3 hours. Collect all heavy mineral together, and then feed it
into shaking table for separation.
(3) Because the operating platform is very quivery when the
crusher is working, please shut it down when the shaking table
start separating work. The gold get from shaking table if it's
still with little impurity, it can be purified to over *0% by
amalgamation.
(4) Please clean machine before shut it down, take water pump
and pipe back and put them to right place, fix the table of
shaking table, raise the mechanical leveling supports and then
drag the trailer go next mining place.
País: | China |
N º de Modelo: | HC2156 |
Precio FOB: | 17000 ~ 27000 / Set ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 17000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | Exporting packing standard |
El tiempo de entrega: | Withiin 7 days after the down payment |
Capacidad de suministro: | 500 Set per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Mobile Gold Recovery Plant |