Precio FOB
Obtener el precio más reciente( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
WPE01
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
iron frame
El tiempo de entrega:
45 days after payment
Capacidad de suministro:
3 Set per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Ms. Alice
North Head of High Speed East Road,Economic Development Zone, Dezhou, Shandong
1.The system includes stone removal, iron removal, bucket elevator, material hopper, crushing and dust removal equipments, etc.
2.The system work under full closed state, reducing the dust and noise pollution greatly,with high work efficiency
3.The material
is with options of plastic, carbon steel or stainless steel,etc,according to goods character and texture.
País: | China |
N º de Modelo: | WPE01 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | iron frame |
El tiempo de entrega: | 45 days after payment |
Capacidad de suministro: | 3 Set per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |