Precio FOB
Obtener el precio más reciente|
1 Set Minimum Order
País:
China
N º de Modelo:
light keel
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
as costomer's request
El tiempo de entrega:
within 45 working days after receipt of deposit
Capacidad de suministro:
6 Set per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
-
Persona de contacto Joy
Yingbin Road, Botou, Hebei
Main channel forming machine
1.Roll forming process flow
De-coiler*-Guider*-Roll forming*-cutting-tolength*-collection table
2.Equipment structure
It is making up of de-coiler, guide rack, correction system, cutting-to-length, electrical
control system etc.
3.unit performance
Machine capacity: width≤**0mm, thickness:0.**1mm
Product speed: ***0m/min
Total power: about9.5kw
Occupy ground area: length *2m x width 2m
4.Each main part parameter:
De-coiler: Inner expanding type, capacity:2T
2Roll forming machine
Rack frame: Overall steel plate structure
Roll forming rack: *2 sets
The diameter of the roller axis:φ*0mm, roller surface:**0mm
Material: *0Cr quenching treatment HB**0
Drive type: Chain drive
Main power: 5.5kw timing electromoto
Material:GCr*5, Quenching,Hardness:HRC****2º
Assistant roller rack: 2sets
Adjust part: Turkey emendation type(three-dimensional emendation)
5.cutting-to-length system
Hydraulic cutting, Hydraulic pumping station electromotor power: 3KW
País: | China |
N º de Modelo: | light keel |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | as costomer's request |
El tiempo de entrega: | within 45 working days after receipt of deposit |
Capacidad de suministro: | 6 Set per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |