¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
LFBJMB steel structure space frame construction coal storage shed
Prev
LFBJMB steel structure space frame construction coal storage shed
Next

LFBJMB steel structure space frame construction coal storage shed

30 ~ 100 / Square Meter

|

200 Square Meter Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

30 ~ 100 / Square Meter Obtener el precio más reciente

Lugar de origen:

customize

Precio de pedido mínimo:

30 per Square Meter

Cantidad de pedido mínimo:

200 Square Meter

Detalle de embalaje:

customize

El tiempo de entrega:

customize

Capacidad de suministro:

-

Tipo de pago:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal

Grupo de productos :

Contactar ahora
Miembro Básico

Persona de contacto Wendy

11, Nanjing, Jiangsu

Contactar ahora

Descripción del producto

1. The mobile scaffolding operation platform is erected on the space frame of the coal storage shed. The scaffolding column should be welded to the bad steel by electric welding, and the vertical and horizontal scissors need to be set at a distance of **0mm from the bad steel surface. Scaffold braces, stair platforms, safety protection near the working floor, and scaffold pavement shall comply with relevant regulations. Mobile scaffolding must follow the requirements of the key safety construction organization plan when it is towed.
2. The dry coal shed space frame scaffolding needs to be guided by full-time personnel every time it is towed, and the full-time personnel observes it. After a trial drag of **2m, check the deformation of the shelf, and the tow can only be declared after confirming that there is no deformation. After dragging and positioning, deal with the deformation and inertia of the scaffolding for a comprehensive inspection, and use it after confirming that there is no deformation. Concrete components such as steel bolt balls and components of the spherical space frame of the dry coal shed should be hoisted to the scaffolding platform in stages. It should not be piled up on the iron shelf platform in a large amounts at one time, and it should be assembled and hoisted at the same time. The number of inspection personnel on the scaffold platform should be reduced as much as possible, and not many people are concentrated in one span of the scaffold during operation.
3. Workers who assemble steel bolt balls and components in the dry coal shed space frame body should use safety belts, and the safety belts should be placed on a solid structure. The installers must be equipped with electric tool kits and special tool hooks.
4. When positioning, dragging, or jacking the space frame of the dry coal shed, all equipment should be fixed and firm, a solid working platform should be set at the operating position, and walking guardrails or guardrails should be set. When dragging or jacking operations, no one should stay on the spherical space frame of the dry coal shed space frame.
W/app: **6 * *@********************body>

País: China
N º de Modelo: -
Precio FOB: 30 ~ 100 / Square Meter Obtener el precio más reciente
Lugar de origen: customize
Precio de pedido mínimo: 30 per Square Meter
Cantidad de pedido mínimo: 200 Square Meter
Detalle de embalaje: customize
El tiempo de entrega: customize
Capacidad de suministro: -
Tipo de pago: T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Grupo de productos : coal shed

Send a direct inquiry to this supplier

A:

Wendy < LFBJMB2021 >

quiero saber: