Precio FOB
Obtener el precio más reciente15412.4 ~ 25881.2 / Unit
|1 Unit Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
15412.4 ~ 25881.2 / Unit Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
15412.4 per Unit
Cantidad de pedido mínimo:
1 Unit
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
15 Unit per Week
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Ms. lu
NO.2509,Wangyuan Road,Fengxian District, Xianyang, Shanghai
Computer optimized structure design, three beams and four columns
structure, simple, economic and practical
Hydraulic control using cartridge valve integrated system, reliable
action, long service life, hydraulic impact is small, reduce the
connection line and leakage point
Independent electrical control system, reliable work, intuitive
action, easy maintenance
Adopt centralized control, with adjustment, manual and
semi-automatic three operation modes
through the operation of panel selection, two kinds of forming
process can be realized, such as fixed range and fixed pressure,
and has the functions of calendering time
preservation
the working pressure of the slide block, the range of fast down and
slow working can be adjusted according to the technological
needs
País: | China |
N º de Modelo: | - |
Precio FOB: | 15412.4 ~ 25881.2 / Unit Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 15412.4 per Unit |
Cantidad de pedido mínimo: | 1 Unit |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | 15 Unit per Week |
Tipo de pago: | - |
Grupo de productos : | - |