¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Hydraulic Crawler Bulldozer SD32 Track Roller Shantui Single Flange Hydraulic Crawler Bulldozer SD32 Track Roller Shantui Single Flange
Next

Hydraulic Crawler Bulldozer SD32 Track Roller Shantui Single Flange

1 ~ 100 / Piece

|

1 Piece Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

1 ~ 100 / Piece Obtener el precio más reciente

Lugar de origen:

shandong china

Precio de pedido mínimo:

1 per Piece

Cantidad de pedido mínimo:

1 Piece

Detalle de embalaje:

Standard Fumigated Export Wooden Pallet .

El tiempo de entrega:

5-7 Days After Received The Payment

Capacidad de suministro:

1000 Piece per Day

Tipo de pago:

T/T

Grupo de productos :

Contactar ahora
Miembro Básico

Persona de contacto betty

NO.33 yingcui road, Jining , Shandong

Contactar ahora

Especificaciones del producto

  • Brand Name: shantui komatsu
  • Condition: New
  • Moving Type : Crawler Bulldozer
  • Dimension(Long * Breadth * High): 1*1*1
  • color:yellow
  • Size:Standard Bulldozer Track Roller Shantui
  • Shantui Material:40cr50Mn
  • Process: Heat Treatment

Descripción del producto

Hydraulic Crawler Bulldozer SD*2 Track Roller Shantui Single Flange

Original SHANTUI Parts,SHANTUI Genuine parts

* Bulldozer Shantui SD*2

Track Roller

1. Our Track Roller Advantages / Features:

a. We use *0cr*0Mn for our material .We purchse raw meterial steel from several large steel groups,such as Hangzhou Iron and Steel 

Group  Company,Shanghai Baoshan Iron and Steel Group Company,make sure of our raw material quality.

b. Surface hardness HRC****8 for reduced wear and longer life, adding value to your products further to your business by maximizing durability of your products. 

c. Each roller shaft is engineered drop-forged and machined by the utilization of the most modern technological advances known to the industry , Grinding and finishing methods , etc to guarantees max strength , max life .

d.Each roller shell is carefully heat treated to ensure long wear life and stress resistance .

2. Our Track Roller Models :

a.Track Roller For Bulldozers

Shantui SD*3 ,SD*6 ,SD*2 ,SD*3 ,SD*2 ,SD*2 ,TY**0 ,TY**0 ,TY**0 ,TY**0 ,TY**0
Komatsu D*0 ,D*0 ,D*0LE ,D*0 ,D*5 ,D**5
  D6G ,D6R ,D6H
Shenwa T**0 ,TY**5 ,SD7 ,SD8

b. Track Roller For Excavators

 

Komatsu PC*5 ,PC*0 ,PC*5 ,PC*0 ,PC**0 ,PC**0 ,PC**0 ,PC**0 ,PC**0 ,PC**0 ,PC**0
Hitachi EX*0 ,EX**0 ,EX**0 ,EX**0 ,EX**0 ,EX**0 ,EX**0 ,EX**0 ,EX**0
Volvo EC*5 ,EC**0 ,EC**0 ,EC**0 ,EC**0 ,EC**0 ,EC**0 ,EC**0
  E**0 ,E**0 ,E**0 ,E**0B ,E**5 ,E**0 ,E**0
Daewoo DH*5 ,DH***7 ,DH*0 ,DH**0 ,DH**5 ,DH**0 ,DH**0 ,DH**0 ,DH**0
Kobelco SK*0 ,SK ,SK **0 ,SK**0 ,SK**0 ,SK**0 ,SK**0 ,SK**0
Hyundai R***5 ,R***7 ,R**0 ,R****5 ,R****7 ,R**0

3. If you don't find your model ,If you need to customize ,please give me the datas as follows :

Data Measurement

a. Data For Bulldozer :

b. Data For Excavator :
4. About Company                             **- Jining Zhongbang Construction Machinery Co., Ltd has more than *0 years of experience in construction machinery industry.

**-We are professional supplier for spare parts of  KOMATSU, HITACHI, KOBELCO, KATO, DOOSAN, DAEWOO,  HYUNDAI, SHANTUI, ZOOMLION, PENGPU, YISHAN, CUMMINS, WEICHAI, SHANGHAI Diesel, etc .

 

  5. Packaging & Delivery                                                                                                                                                         

1.Usually, the goods will be dispatched within 7 days after receipt of payment.

2.Upon receipt of payment, IN-STOCK items will ship on or before the next business day.

3.Though we pride ourselves on fast order processing and shipping, sometimes delays may occur. Please be patient, and keep in touch with us via email.

 

6.Customer Service                                                                                    

1.You may email us through the Alibaba messaging system if you have a question or would like to submit a comment.

2.Generally, email will be responded to within *4 hours; except on every Sunday and holidays. We will reply as soon as we back in office.

3.Though we pride ourselves on fast order processing and shipping, sometimes delays may occur. Please be patient, and keep in touch with us via email.

 Should you be dissatisfied with our service for any reason, please contact us. 

País: China
N º de Modelo: -
Precio FOB: 1 ~ 100 / Piece Obtener el precio más reciente
Lugar de origen: shandong china
Precio de pedido mínimo: 1 per Piece
Cantidad de pedido mínimo: 1 Piece
Detalle de embalaje: Standard Fumigated Export Wooden Pallet .
El tiempo de entrega: 5-7 Days After Received The Payment
Capacidad de suministro: 1000 Piece per Day
Tipo de pago: T/T
Grupo de productos : shantui bulldozer parts

Send a direct inquiry to this supplier

A:

betty < jining zhongbang constraction machinery co., ltd >

quiero saber: