Precio FOB
Obtener el precio más reciente35 ~ 65 / Square Meter ( Negotiable )
|100 Square Meter Minimum Order
País:
China
N º de Modelo:
Light/ heave
Precio FOB:
35 ~ 65 / Square Meter ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
35 per Square Meter
Cantidad de pedido mínimo:
100 Square Meter
Detalle de embalaje:
Suitable for loding containers and protect
El tiempo de entrega:
30 days
Capacidad de suministro:
8000 Ton per Week
Tipo de pago:
T/T
Grupo de productos :
-
Persona de contacto Mr. Michael
changhong, Qingdao, Shandong
1 | brief description of steel structure | ||
Brand Name | YL | ||
Model Number | Light steel portal frame steel structure | ||
Material | Q**5&Q**5 steel or according to the design | ||
Certificate | ISO***1:***0, OHSAS ****1:***9 , ISO****1:***4 | ||
Main Components | H Beam/ UB / C purlin / Z purlin / sandwich panel / Corrugated steel sheet / Bolts and other fittings. | ||
Standard | ASTM, GB,EN,DIN,BS | ||
Surface Treatment | Impeller blasting black, painted, hot dip galvanized | ||
Delivery Time | ****0 days as the requirement | ||
HS Code | *******0 | ||
Advantages |
1).Easy to assemble and
dismantle. 2).Nice appearance, easy to maintenance. |
||
Installation |
1).Our engineer helps to instruct
installation 2).We dispatch the erection staff |
||
Main market | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | ||
Test | As standard and requirement | ||
2 | treatment methods about the product Surface | ||
Paint | *0um or As the requirement of customers | ||
Hot Dip Galvanize | *5um or as the requirement of client | ||
Other | Accord to your require |
País: | China |
N º de Modelo: | Light/ heave |
Precio FOB: | 35 ~ 65 / Square Meter ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 35 per Square Meter |
Cantidad de pedido mínimo: | 100 Square Meter |
Detalle de embalaje: | Suitable for loding containers and protect |
El tiempo de entrega: | 30 days |
Capacidad de suministro: | 8000 Ton per Week |
Tipo de pago: | T/T |
Grupo de productos : | - |