Precio FOB
Obtener el precio más reciente750 ~ 800 USD / Ton ( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
HJ-SP
Precio FOB:
750 ~ 800 USD / Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
750 per Ton
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
BULK PACKING THEN PALLET PACKED
El tiempo de entrega:
30DAYS AFTER PAYMENT
Capacidad de suministro:
200 Ton per Month
Tipo de pago:
T/T, L/C, D/A, D/P, Western Union, PayPal
Grupo de productos :
-
Persona de contacto Ms. zhu
wuyun road, Wuxi, Jiangsu
steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements
1) A
larger capacity
When
the scaffolding geometry and structure is compliant with the
relevant requirements, the general single-tube column scaffold
bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design
value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
PRODUCT TYPES
País: | China |
N º de Modelo: | HJ-SP |
Precio FOB: | 750 ~ 800 / Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 750 per Ton |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | BULK PACKING THEN PALLET PACKED |
El tiempo de entrega: | 30DAYS AFTER PAYMENT |
Capacidad de suministro: | 200 Ton per Month |
Tipo de pago: | T/T, L/C, D/A, D/P, Western Union, PayPal |
Grupo de productos : | - |