Precio FOB
Obtener el precio más reciente15000 ~ 40000 / Piece
|1 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
15000 ~ 40000 / Piece Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
15000 per Piece
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
plastic film
El tiempo de entrega:
20-25 days
Capacidad de suministro:
100 Piece per Year
Tipo de pago:
-
Grupo de productos :
Persona de contacto Mr. Peter
No. 101 ShuangLong Road, Fushan District, Yantai, Shandong
mainly applied in demolishing high-rises. damage building
â–‡ we design long reach excavator boom arm on base of force
analysis, parts drawing generated by CAD, engineer from Caterpiller
company,
â–‡ we have professional digital cutting machine to cut out plates
shape,
â–‡ our welding worker with more than *0years welding
experience.
â–‡ diligent cleaning work before paint
Technical Parameter For Demolition
High Reach
|
|||||||
---|---|---|---|---|---|---|---|
Excavator Operating Weight (Ton) |
*2T
|
*0T
|
*2T
|
*0T
|
*5T
|
*0T
|
*5T
|
Parameter
|
|||||||
Total Length for 3segments (mm)
|
****0
|
****0
|
****0
|
****0
|
****0
|
****0
|
****0
|
Weight(KG)
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
Limitation for Weight of Shear(KG)
|
under**0
|
under***0
|
under***0
|
under***0
|
under***0
|
under***0
|
under***0
|
Overall Height(mm)
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
País: | China |
N º de Modelo: | - |
Precio FOB: | 15000 ~ 40000 / Piece Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 15000 per Piece |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | plastic film |
El tiempo de entrega: | 20-25 days |
Capacidad de suministro: | 100 Piece per Year |
Tipo de pago: | - |
Grupo de productos : | Boom Arm |