Precio FOB
Obtener el precio más reciente700 ~ 900 / Ton ( Negotiable )
|30 Ton Minimum Order
País:
China
N º de Modelo:
API5CT
Precio FOB:
700 ~ 900 / Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
700 per Ton
Cantidad de pedido mínimo:
30 Ton
Detalle de embalaje:
abeled and bundled together with steel strip
El tiempo de entrega:
within 35 days after sign the contract
Capacidad de suministro:
3000 Ton per Week
Tipo de pago:
T/T, L/C, Money Gram
Grupo de productos :
-
Persona de contacto Ms. ying
京沪高速公路沧州北出å£, Cangzhou, Hebei
Hebei Litonglian Seamless Steel Pipe Co,.Ltd is a piping element
company authorized using by America Petroleum
Institute(API5L,API5CT) and Special Equipment Manufacturing License
A1,A2,B,the annual production capacity of seamless steel pipe is
**0,**0 tons.(the price is negotiable)
Professional production are hot rolling structural pipe, Fluid
Conveyance Pipe, Medium, low pressure pipe, Hydrostatic ,
automotive axle housing tube,high-pressure boiler pipe , petroleum
casing pipe,air bottle pipe, Seamless steel tubes for petroleum
cracking, energy accumulator pipe , High-pressure seamless steel
tubes, etc)
Executive Standard
GB/T***2GB/T***3GB/T***7GB/T****6YB/T***5GB***8GB****8GB***9GB/T***0GB/T***2API5LAPI5CT(Non-standard
specifications and materials may agree on the order).
Material
*0#*0#*5#*6mnBClassx****5J*5K*5N*0L***7Simn etc
Name
Specifications Specifications Specifications Specifications Specifications
Seamless Φ**0×***0 Φ**9×***0 Φ**8×***0 Φ**0×***6 Φ**8×***6
Φ**4×***6 Φ**3×***6 Φ**9×***6 Φ**3×***6 Φ**5×***6
Oil
Casing **9.7×6.***0.*4 **8.*5×7.****2.*6 **7.8×6.****3.*2 **9.*8×6.****1.*3 **4.*8×7.****3.*4
Coupling Material **3.*7 **4.*6 **4.*8
Multi-standard varieties of seamless steel tubes, welcome new and
old customers to visit purchase
País: | China |
N º de Modelo: | API5CT |
Precio FOB: | 700 ~ 900 / Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 700 per Ton |
Cantidad de pedido mínimo: | 30 Ton |
Detalle de embalaje: | abeled and bundled together with steel strip |
El tiempo de entrega: | within 35 days after sign the contract |
Capacidad de suministro: | 3000 Ton per Week |
Tipo de pago: | T/T, L/C, Money Gram |
Grupo de productos : | - |