Precio FOB
Obtener el precio más reciente|
20 Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
20 Ton
Detalle de embalaje:
Refractory bricks are packed on wooden pallet and then polyethylene film is placed over it; finally
El tiempo de entrega:
15~20 days
Capacidad de suministro:
1000 Ton per Week
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Mr. Xinglu
No.116 Xinhua West Road, Tangshan, Hebei
High alumina brick:
1. Low price.
2. Pefect Performance.
3. Great bulk density.
4. Low iron content.
1. High Alumina Brick
High Alumina Brick: the temperature of refractoriness under load is normally above ***0~***0°C , which is higher than the fireclay brick and it increases along with the AL2O3 content enhances.
For high alumina brick , the thermal Shock resistance is mainly decided by chemical contents and its mineral microstructure but its thermal shock resistant is worse than the fireclay brick. High alumina brick have very good ability of anti-acidity, anti-metal fluid corrode and anti-oxidation.
High Alumina Brick is used normally in industry furnaces such as Blast furnace, hot-blast furnace and EAF etc.
2. Specification for high alullina brick:
Item |
|||||
GLZ**5 |
GLZ**5 |
GLZ**5 |
GLZ**8 |
||
Al2O3 ,%≥ |
*5 |
*5 |
*5 |
*8 |
|
Refractoriness, °C≤ |
***0 |
***0 |
***0 |
||
0.2Mpa refractoriness under load, °C≤ |
***0 |
***0 |
***0 |
***0 |
|
Reheating linear change, % |
***0°C,2h |
*0.1 |
- |
||
***0°C,2h |
- |
*0.1 |
|||
Apparent porosity, %≤ |
*3 |
*2 |
|||
Compress strength, MPa≥ |
*3.9 |
*9.0 |
*4.1 |
*9.2 |
3. Packing of High Alumina Brick:
Bricks are packed on wooden pallet and then polyethylene film is placed over it, finally the package is tied up with steel strips.
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 20 Ton |
Detalle de embalaje: | Refractory bricks are packed on wooden pallet and then polyethylene film is placed over it; finally |
El tiempo de entrega: | 15~20 days |
Capacidad de suministro: | 1000 Ton per Week |
Tipo de pago: | L/C, T/T |
Grupo de productos : | refractory |