Precio FOB
Obtener el precio más reciente|
1 Piece Minimum Order
País:
South Korea
N º de Modelo:
HEB80H
Precio FOB:
Lugar de origen:
South Korea
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
standard wooden packing
El tiempo de entrega:
3weeks ~ 6 Weeks after order Confirm(depend on Des
Capacidad de suministro:
300 Piece per Day
Tipo de pago:
L/C, T/T
Grupo de productos :
South Korea
Persona de contacto Mr. Steve
#1315 Dooson Tower, 644-4,, Nonhyeon-dong, Namdong-gu
HEB*0H(Side type)for *8~
*6 ton carrier class
[Basic Trade Term]
1) Basic Accessories : Working Demolition Tool * 2 pcs,
Hydraulic Hose 1 Set(2lines), Nitrogen Gas Tank * 1 Bottle, Gas
Charging kit * 1 Set, Maintenance Kit * 1 Set, Manual Guide
Book(1ea)
2) Payment Term : Half payment(*0%) in advance, The last half
(*0%) against B/L
3) Optional Discount Rate : Contact us(Distributor, start
Sample order, quantity, full payment in advance etc.)
4) Delivery Term : FOB INCHEON or BUSAN KOREA
5) Manufacturing Time : Within 2 weeks after receipt of order
confirm
6) Delivery Time : 3weeks ~ 6 Weeks after order
Confirm(depend on Destinations)
7) Origin : R.O.K (Republic of KOREA)
8) Warranty : Basic One(1) year
9) Packing Term : Greased by anti-rust oil, Vacuum-packed by
silver paper, Export standard wooden packing
*0) Price Validity : By End of ***2 year
País: | South Korea |
N º de Modelo: | HEB80H |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | South Korea |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | standard wooden packing |
El tiempo de entrega: | 3weeks ~ 6 Weeks after order Confirm(depend on Des |
Capacidad de suministro: | 300 Piece per Day |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Hydraulic Breaker |