¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Half circle half round large span Corrugated Galvanized Steel Culvert for tunnel liner Half circle half round large span Corrugated Galvanized Steel Culvert for tunnel liner Half circle half round large span Corrugated Galvanized Steel Culvert for tunnel liner Half circle half round large span Corrugated Galvanized Steel Culvert for tunnel liner
Next

Half circle half round large span Corrugated Galvanized Steel Culvert for tunnel liner

1000 ~ 1500 / Ton ( Negotiable )

|

20 Ton Minimum Order

País:

China

N º de Modelo:

CSPS H9000

Precio FOB:

1000 ~ 1500 / Ton ( Negotiable ) Obtener el precio más reciente

Lugar de origen:

Hengshui city, Hebei province, China

Precio de pedido mínimo:

1000 per Ton

Cantidad de pedido mínimo:

20 Ton

Detalle de embalaje:

pallets

El tiempo de entrega:

30DAYS

Capacidad de suministro:

4000 Ton per Month

Tipo de pago:

L/C, T/T

Contactar ahora
Miembro Básico

Persona de contacto Ms. Sunny

Hengshui, Hebei

Contactar ahora

Descripción del producto

Half circle half round large span Corrugated galvanized steel culvert for tunnel liner are widely used in road culverts, highway culvert,bridge culvert, tunnel culvert and drainage pipe.
 

  • TECHNICAL SPEC:

1.Material of steel plate: Q**5 or SS**0

2.Thickness of steel plate:1.5mm*8mm

3.Pipe Diameter: **0mm****0mm

4.Corrugation Size: *8**3,**5**5, **0**0, **0**5, **0***0, **0***0, **0***0

5.Depth of fill: 1.***0m

6.Anti-corrosion treatment: hot dip galvanized ≥*4μm(**0g/㎡)

7.The second anti-corrosion: usually asphalt(bitumen) coated or epoxy resin coated.

8.Using life:≥**0years.

9.Standard: JTT *******0 ,or AASHTO M*6.

 
  • TECHNICAL ADVANTAGES

1. High strength:1.**3 times stronger than concrete 

2. Light weight:1/***1/5 weight of same specification concrete weight.

3. Long service life:normally more than **0 years

4. Low cost:when the span is larger than 1meter, the bigger the span is, the more obvious it shows

5. Convenient construction:no need of large machinery, only little manual operation.

6. Axial direction:can be used in a severe sedimentation area.

7. Shorten construction period for about half time, save labor charges.

8. avail to improving the structure of the soft soil foundation and the interlocking of the junction of the embankment, which improves the comfortableness of the car on the bridge.

9. Environmental, low carbon:Reduce or abandon normal construction materials, like concrete, yellow sand, cobblestone, and woods, which means a lot to environment.

*0. Convenient maintenance, even no need to maintain under certain condition, lower the operating cost.

 
  • PACKING & DELIVERY

-Packing Details: Standard export packing or as customer's requirement

-Delivery Time: ***0m within 1 month

-Delivery Term: FOB Tianjin Xingang port or CIF customers port

País: China
N º de Modelo: CSPS H9000
Precio FOB: 1000 ~ 1500 / Ton ( Negotiable ) Obtener el precio más reciente
Lugar de origen: Hengshui city, Hebei province, China
Precio de pedido mínimo: 1000 per Ton
Cantidad de pedido mínimo: 20 Ton
Detalle de embalaje: pallets
El tiempo de entrega: 30DAYS
Capacidad de suministro: 4000 Ton per Month
Tipo de pago: L/C, T/T
Grupo de productos : Assembly Corrugated Steel Pipe

Send a direct inquiry to this supplier

A:

Ms. Sunny < Hengshui Qijia Engineering Materials Co. >

quiero saber: