¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Gravel pile machine pile driver
Next

Gravel pile machine pile driver

( Negotiable )

|

1 Set Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

( Negotiable ) Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1 Set

Detalle de embalaje:

-

El tiempo de entrega:

-

Capacidad de suministro:

100 Set per Year

Tipo de pago:

-

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Alina

Haihe road ,Pizhou Ecomic Development Zone Jiangsu Province, Xuzhou, Jiangsu

Contactar ahora

Descripción del producto

Vibration Gravel Pile Driver is the popular machine used for the foundation construction of high-rise building. The hydraulic rotation of this kind of vibration Pipe Gravel Pile is flexible and could rotate **0°. The machinery could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, it is the best investment to improve your business productivity.

Operation Process:

1, Move the pile machine and body frame, make the pile tip align with pile location.

2, Drive the Vibratory Hammer, drop the pile to the established depth.

3, Fill in the required volume gravel to the pile machine.

4, Pump the air into the pile machine by air compressor.

5, Lift the machine1—2m, the gravel will drop to the drilling hole by the air pressure and gravity.

6, Drop the pile machine to ensure the gravel compact.

7, Repeat above (4)、(5)、(6) process.

8, When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat  above (4)、(5)、(6) process.

9, When the pile machine lifted to the designed height of the pile top, all the process complete.

By this means, the construction speed is 1.**2.6 times than routine methods.

 

Main Technical Data:

Technical Data

Model

DCB****5S

DCB****0S

DCB*****0S

DCB******0S

Max Vibratory Hammer Model

DD*3/TD*0      

/DZ*5KS

DD*3/TD*2 

/DZ*0KS

DD*3/TD*2       

/DZ*0KS

DD**3/TD**0   

/DZ**0KS

Max. Piling Diameter (mm)

**0

**0

**0

**0

Max. Piling Depth (m)

*5

*5

*5

*5

Main Winch Line Pull (T)

5

8

8

*0

Auxiliary Winch Line Pull (T)

3

3

5

5

País: China
N º de Modelo: -
Precio FOB: ( Negotiable ) Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1 Set
Detalle de embalaje: -
El tiempo de entrega: -
Capacidad de suministro: 100 Set per Year
Tipo de pago: -
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Alina < Xuzhou Hercules Machine Manufacture Co., >

quiero saber: