Precio FOB
Obtener el precio más reciente3.1 / Square Meter
|110 Minimum Order
País:
China
N º de Modelo:
HJE14
Precio FOB:
3.1 / Square Meter Obtener el precio más reciente
Lugar de origen:
Anping
Precio de pedido mínimo:
3.1 per Square Meter
Cantidad de pedido mínimo:
110
Detalle de embalaje:
In rolls, wrapped with moisture-proof paper, then in carton
El tiempo de entrega:
15-20 days
Capacidad de suministro:
150 Piece per Day
Tipo de pago:
Other, D/P, L/C, T/T
Grupo de productos :
Persona de contacto Ms. Lisa
The T-crossing of Heping Road and Mingmen Street, Mingmenhuadu Community,, Hengshui, Hebei
DBL Galvanized Steel Mesh with Powder Coating
Galvanized steel mesh is aviliable in flattened or standard (
raised) styles with a varity of
optionsin area, pattern, area design and more.
General idea of expanded metal mesh as followings:
1. Material: Thin low carbon steel plate, stainless steel plate,
aluminum plate, brass plate,
Al-Mg ally plate, Lead plate, Titanium plate, Alum-platinum
plate
2. Thickness: 0.5mm*8mm
3. Variety: Small, medium and heavy expanded metal mesh, expanded
aluminum mesh, expanded
platinum filtration mesh, expanded brass mesh
4. Surface treatment: Galvanized, PVC coated
5. Produce processes: Punching and pulling
6. Characteristics: It is strong and wear-resisting, artistic and
tasteful.
7. Usage: Mainly applied as platforms and stair treads for
constructions, vessels bridges and
boilers. They are also used as reinforcement for light construction materials and concrete
pouring, radiator grills on all type of vehicles and air-compressors, safety guards for gear-
drive equipment on various kinds of machines
8. Package: In rolls, wrapped with moisture-proof paper, then in
carton
País: | China |
N º de Modelo: | HJE14 |
Precio FOB: | 3.1 / Square Meter Obtener el precio más reciente |
Lugar de origen: | Anping |
Precio de pedido mínimo: | 3.1 per Square Meter |
Cantidad de pedido mínimo: | 110 |
Detalle de embalaje: | In rolls, wrapped with moisture-proof paper, then in carton |
El tiempo de entrega: | 15-20 days |
Capacidad de suministro: | 150 Piece per Day |
Tipo de pago: | Other, D/P, L/C, T/T |
Grupo de productos : | Expanded Metal |