Precio FOB
Obtener el precio más reciente5 ~ 15 USD / Piece
|100 Piece Minimum Order
País:
China
N º de Modelo:
WJ-C001
Precio FOB:
5 ~ 15 USD / Piece Obtener el precio más reciente
Lugar de origen:
Shandong, China
Precio de pedido mínimo:
5 per Piece
Cantidad de pedido mínimo:
100 Piece
Detalle de embalaje:
steel pallet
El tiempo de entrega:
15-35days after SC
Capacidad de suministro:
90000 Piece per Month
Tipo de pago:
Western Union, D/P, L/C, T/T
Grupo de productos :
Persona de contacto karen
JINLING INDUSTRIAL PARK, JIHONGTAN ROAD, CHENGYANG, QINGDAO, Shangdong Province, Qingdao, Shandong
Galvanized Scaffolding Steel Plank
Galvanized kwikstage scaffolding steel plank | ||
length | width | height |
3.0m | **0mm | *3mm |
2.4m | ||
1.8m | ||
1.2m | ||
1.0m | ||
0.7m |
Our steel plank can load maximum weight of **0 kg with the help of stiffening strips at the bottom.
a) A competitive price can be offered because we are a specialized manufaturer of scaffolding with an advantage on cost-controlling & production .
b) Timely delivery , we have two factories so far covering over ****0 square meters ,and the third one will be put into production in April ,***3 . High production capacity contributes to timely delivery.
c) Certificates of AS***6; ISO ***1:***0 can
guarantee the quality of our products
Pls contact me if you have any questions
& welcome pay a visit to our
factory
País: | China |
N º de Modelo: | WJ-C001 |
Precio FOB: | 5 ~ 15 / Piece Obtener el precio más reciente |
Lugar de origen: | Shandong, China |
Precio de pedido mínimo: | 5 per Piece |
Cantidad de pedido mínimo: | 100 Piece |
Detalle de embalaje: | steel pallet |
El tiempo de entrega: | 15-35days after SC |
Capacidad de suministro: | 90000 Piece per Month |
Tipo de pago: | Western Union, D/P, L/C, T/T |
Grupo de productos : | Steel Plank |