Precio FOB
Obtener el precio más reciente0.4 ~ 0.5 / Piece ( Negotiable )
|5000 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
0.4 ~ 0.5 / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
0.4 per Piece
Cantidad de pedido mínimo:
5000 Piece
Detalle de embalaje:
According to customer's requirement
El tiempo de entrega:
Within 7 days after the down payment
Capacidad de suministro:
50000 Piece per Week
Tipo de pago:
L/C, T/T
Grupo de productos :
-
Persona de contacto Mr. Edward
No.448 West Heping Road, Shijiazhuang, Hebei
* Name: Formwork wing nut
* Material: Cast iron
* Size: M*2, M*7, M*2
* Surface treatment: Zinc plating, plain
* Usage: Used with the tie rod to tighten the concrete formwork.(
The wing nut can be easily fastened on the tie rod and is a very
quick and easy way for erecting a formwork for filling concrete in
walls.
* Certification: ISO***1:***0
País: | China |
N º de Modelo: | - |
Precio FOB: | 0.4 ~ 0.5 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 0.4 per Piece |
Cantidad de pedido mínimo: | 5000 Piece |
Detalle de embalaje: | According to customer's requirement |
El tiempo de entrega: | Within 7 days after the down payment |
Capacidad de suministro: | 50000 Piece per Week |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |