Precio FOB
Obtener el precio más reciente1000 ~ 1500 USD / Piece ( Negotiable )
|1 Minimum Order
País:
China
N º de Modelo:
PW-GC-F
Precio FOB:
1000 ~ 1500 USD / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
1000 per Piece
Cantidad de pedido mínimo:
1
Detalle de embalaje:
standard export package
El tiempo de entrega:
4 weeks after down payment
Capacidad de suministro:
500 Piece per Month
Tipo de pago:
PayPal, Western Union, D/P, L/C, T/T
Grupo de productos :
Persona de contacto Ms. Wendy
East Jinyang road, Suzhou, Jiangsu
Fixed Gas cooler
This device removes the moisture in the sample gas by means of
compressor refrigeration, to protect the analyzer from being
damaged by liquid and minimize the loss of other component
that is easily soluble in water.
Features
☆ High quality
compressor and refrigeration valve, stable performance
☆ Double condensation,
better dehydration effect
Model No. | PW-GC-F |
Working temprature | 5~*0℃; |
Inlet dew point | ≤*0℃(working temprature *5℃) |
Outlet dew point | ≤4℃(working temprature *5℃) |
Refrigerating control temperature | 3℃ ( factory settings ) |
Cooling mode | fluorine free compressor |
Condenser pipe | glass heat exchange tube |
Input sample gas pressure | ≤3bar |
Differential air pressure | ≤3mbar(flow rate 2Nl/min.) |
Sample gas processing capacity | **0NL/h |
Sample gas inlet/outlet | OD6mm |
Water-drop outlet | OD6mm |
Warm-up time | ≤*0min |
Alarm | high/low termprature alarm NC/NO alarm |
País: | China |
N º de Modelo: | PW-GC-F |
Precio FOB: | 1000 ~ 1500 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 1000 per Piece |
Cantidad de pedido mínimo: | 1 |
Detalle de embalaje: | standard export package |
El tiempo de entrega: | 4 weeks after down payment |
Capacidad de suministro: | 500 Piece per Month |
Tipo de pago: | PayPal, Western Union, D/P, L/C, T/T |
Grupo de productos : | Preprocessing treatment |