Precio FOB
Obtener el precio más reciente5 ~ 30 / Meter
|50 Meter Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
5 ~ 30 / Meter Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
5 per Meter
Cantidad de pedido mínimo:
50 Meter
Detalle de embalaje:
pvc polybag
El tiempo de entrega:
within 7-15 days
Capacidad de suministro:
1000 Meter per Day
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Ms. Crystal
sangzhou Town,Ninghai Country, Ningbo, Zhejiang
characteristics
It is suitable for conveying va rious kinds of
material in cold a reas or cool warehouse The product Is divided
Into two fypes: 1,UsedIn an ambienffemperatu re of**0°C-**0°C
2,Used in an ambient temperatu re of*0C-**0
C
Cored structure is
divided into two type,ordinary and reinforced Combined
cis—butadiene synthetic
rubber and natural rubber is used as covering rubber.which is
endowed with highest elasticity
and cold—resistant performance,able to work properly in subze ro
temperatu re of**0"C
Application
It is suitable for conveying va rious kinds of
material in cold a reas or cool warehouse
The product Is divided Into two fypes:
1,UsedIn an ambienffemperatu re of**0°C-**0°C
2,Used in an ambient temperatu re of*0"C-**0 C
Teshnical indexes
1. Cold resistant conveyor belt can be divided into three types
,according to the properties of cover: Laceration
resistant type(H),Anti-abrasive type(D)and Ordinary type(L).
2. According to the different cold resistant , it can be divided
into two types of C1 and C2 - Working
temperature:***-**0.
Below is
our Conveyor belt production
process
1.conveyor belt raw materials (nature rubber
&CC/NN/EP fabric)
2.conveyor belt
producing(smelting-shaping-vulcaniaztion-finished)
3.conveyor belt
quality
control
4.conveyor belt package and
delivery
País: | China |
N º de Modelo: | - |
Precio FOB: | 5 ~ 30 / Meter Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 5 per Meter |
Cantidad de pedido mínimo: | 50 Meter |
Detalle de embalaje: | pvc polybag |
El tiempo de entrega: | within 7-15 days |
Capacidad de suministro: | 1000 Meter per Day |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |