Precio FOB
Obtener el precio más reciente2 ~ 10 / ( Negotiable )
|500 Piece Minimum Order
País:
China
N º de Modelo:
ST-LF
Precio FOB:
2 ~ 10 / ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
2
Cantidad de pedido mínimo:
500 Piece
Detalle de embalaje:
wooden pallets
El tiempo de entrega:
15-20days
Capacidad de suministro:
10000 Piece per Week
Tipo de pago:
Money Gram, Western Union, L/C, T/T
Grupo de productos :
-
Persona de contacto Lee
Shijiazhuang, Hebei
EAC Cooling Tower Fill Introduction
EAC cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower. It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
EAC Cooling Tower Fill Specification
Name |
EAC Cooling Tower Fill |
Type |
Cross flow cooling tower fill |
Material |
PVC, PP, UPVC |
Size |
***0mm*any length |
Thickness |
0.35mm-0.*5mm |
Application Temperature |
*5℃~**5℃ |
Color |
Black |
Packaging Detail |
In bundle, film+wooden pallet or as your requests. |
MOQ |
**0 pieces |
Delivery period |
Within *5 days after receiving the deposit |
Welcome to contact us: admin at sintafrp.cn; skype:sinta***4
País: | China |
N º de Modelo: | ST-LF |
Precio FOB: | 2 ~ 10 / ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 2 |
Cantidad de pedido mínimo: | 500 Piece |
Detalle de embalaje: | wooden pallets |
El tiempo de entrega: | 15-20days |
Capacidad de suministro: | 10000 Piece per Week |
Tipo de pago: | Money Gram, Western Union, L/C, T/T |
Grupo de productos : | - |