Precio FOB
Obtener el precio más reciente150 ~ 10000 USD / Piece
|1 Piece Minimum Order
País:
China
N º de Modelo:
C2F
Precio FOB:
150 ~ 10000 USD / Piece Obtener el precio más reciente
Lugar de origen:
Henan
Precio de pedido mínimo:
150 per Piece
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
Wooden box
El tiempo de entrega:
10 days
Capacidad de suministro:
100000 Piece per Year
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Mr. dongyang
Yongan road, Gongyi, Henan province, China, Zhengzhou, Henan
The Dismantling Joints are double flanged fittings that accommodate
up to **0mm (4€Â) longitudinal adjustment and can be locked at
the required length with the tie bars supplied. Not only does this
system allow for fast, easy maintenance of valves, pumps or meters,
it simplifies future pipe work modifications and reduces downtime
when changes need to be made.The installation is also
straightforward using just a spanner and torque wrench to tighten
the high tensile steel or stainless steel tie bars. With fewer tie
bars than flange holes and the tie bars acting as flange jointing
bolts theprocess is speeded up but still offers a secure, rigid,
fully endload resistant system with a pressure rating equal to that
of the flange.A comprehensive range is available from DN*0
(1½€Â) to DN***0 (*0€Â) with virtually any flange drilling
or pressure rating supplied, although larger sizes and custom made
Dismantling Joints can be designed and built on request
Gongyi Yuxiang Water Supply Materials CO.LTD
skype:yu.xiang*2
whatsApp:**6 **********0
País: | China |
N º de Modelo: | C2F |
Precio FOB: | 150 ~ 10000 / Piece Obtener el precio más reciente |
Lugar de origen: | Henan |
Precio de pedido mínimo: | 150 per Piece |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | Wooden box |
El tiempo de entrega: | 10 days |
Capacidad de suministro: | 100000 Piece per Year |
Tipo de pago: | T/T |
Grupo de productos : | Compensator |