Precio FOB
Obtener el precio más reciente( Negotiable )
|10 Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
10 Ton
Detalle de embalaje:
-
El tiempo de entrega:
15 to 20days
Capacidad de suministro:
500 Ton per Week
Tipo de pago:
T/T, L/C
Grupo de productos :
Persona de contacto Mr. Allen
Brocade Group, No. 9 Gangxing Road, Jinan, Shandong
Cold drawn seamless steel pipe is made from a seamless steel
hollow. It is further processed by cold drawing over a mandrel, to
control the ID, and through dies to control the OD. CDS is
superior in surface quality, dimensional tolerances and strength
when compared to hot finished seamless tubing.Due to the
characteristics of high-precision, in precision machinery
manufacturing, auto parts, hydraulic cylinders, construction (steel
sleeve) industry has a very wide range of applications.
Size: *6mm**9mm.
W.T.: 0.8mm**8 mm.
Shape: Round.
Production type: Cold drawn or cold rolled.
Length: Single random length/ Double random length or as customers
actual request max length is *0m
Annealing
After the goods are cold drawn to sizes, the tubes are put on
annealing furnace for heat treatment and normalising.
Straightening
Post annealing, the goods are passed through a seven roller
straightening machine to achieve proper straightening of the
tubes.
Eddy current
Post straightening, each tube is passed through eddy current
machine to detect for surface cracks and other defects . Only the
tubes that pass eddy current are fit for delivery to customers.
Finishing
Each tube is either oiled with corrosion resistant oil or varnished
for surface protection and corrosion resistant as per customers
requirement, each tube end is covered by plastic end caps to avoid
damage in transit, the marking and specs are put and the goods are
ready for dispatch.
País: | China |
N º de Modelo: | - |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 10 Ton |
Detalle de embalaje: | - |
El tiempo de entrega: | 15 to 20days |
Capacidad de suministro: | 500 Ton per Week |
Tipo de pago: | T/T, L/C |
Grupo de productos : | Carbon Seamless Steel Pipe |