Precio FOB
Obtener el precio más reciente|
1 Set Minimum Order
País:
China
N º de Modelo:
TG
Precio FOB:
Lugar de origen:
china
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
-
El tiempo de entrega:
30d
Capacidad de suministro:
5 Set per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Mr. Wang
nanmofang rd., Beijing, Beijing
grab. Our diaphragm wall grabsare a kind of hydraulic diaphragm wall grab.
Diaphragm walls are underground structural elements principally used forretention systems and permanent foundation walls.
Our TG series hydraulicdiaphragm wall grabs are ideal forpit strutting, dam antiseepage, excavationsupport, dock cofferdam and
foundation element, and are also suitable for theconstruction of square piles. It is one of the most efficient and versatileconstruc
-tion machines on the market .
As a result of their undoubted strength, simplicity and low running cost,our TGSeries cableoperated grabs for diaphragm Walls
are widely used in theconstruction of foundations and trenches.Rectangular or semicircular jaws withtheir relative guides are
interchangeable on the actual grab body. Unloading isdone by taking advantage of the grab body's weight. When released by the
rope,the grab descends with considerable force, thus helping unload material from the jaws.
TG**-Technical specifications |
||
|
Euro Standards |
U.S Standards |
Width of trench |
*******0mm |
****0in |
Depth of trench |
*0m |
**4ft |
Max. pull force |
**0kN |
****0 lbf |
Volume of grab bucker |
1.**1.2 m³ |
1.**1.2 m³ |
Undercarriage Model |
CAT**9D |
CAT**9D |
País: | China |
N º de Modelo: | TG |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | china |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | - |
El tiempo de entrega: | 30d |
Capacidad de suministro: | 5 Set per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |