¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
DAJABARA Cooling Tower Cleaning System
Next

DAJABARA Cooling Tower Cleaning System

|

1 Minimum Order

País:

South Korea

N º de Modelo:

KMX-AO2601T

Precio FOB:

Lugar de origen:

Republic of Korea

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1

Detalle de embalaje:

Standard Wooden Packaging

El tiempo de entrega:

15 to 20 days

Capacidad de suministro:

30

Tipo de pago:

-

Grupo de productos :

-

Contactar ahora

KMX Co.,Ltd.

South Korea

Miembro Básico

Persona de contacto Mr. MinSoo

Dong-gu, Daejeon

Contactar ahora

Descripción del producto

A DaJaBaRa Scale Collector

image

image

Do you have a problem of your cooling tower water quality? 
Here is the solution for your matter!
 
Cooling Water Cleaning System (DaJaBaRa Scale Collector)
 
DaJaBaRa Scale Collectors trait.

  1. It removes the scale which is fixed to the equipment of cooling water system by using the principle of electrolytic method. (Removes solid scales by using Eletrolytic Technology)
  2. This is Cooling Water Cleaning System which prevents scales generated at Cooling tower filler, circulation piping, Evacon tube etc.
  3. It removes the scale which is fixed in cooling towers and heat exchanger while preserving water.
  4. It kills bacteria and microorganism such as legionella and salmonella in cooling water and removes scale.
  5. Instead of using existing high-risk chemical products that cause the water pollution and environmental pollution, by using eco friendly product (DaJaBaRa), it operates the excellent efficiency regarding the enviornmental protection and energy saving ater installation. It works by electricity not using chemicals.
 
Installation Location
CW Supply piping between cooling tower and heat exchanger.
 
Processing Capacity (RT : Ton of Refrigeration)
The processing capacity per unit of DaJaBaRa should be more than the cooling tower's replenishing water amount
and cooling tower's replenishing water amount corresponds to the 1.2% of cooling water circulating amount.
In case of 500RT, because the circulation volume of the cooling water is 390 ton/hr, 390 ton /hr x 0.012 = 4.68 ton / hr (cooling tower replenishing water amount) is calculated.
So, because of the standard processing amount of 500RT is 5.0ton/hr > 4.68ton/hr (cooling tower replenishing water amount), 1 unit shall be installed.
 
DaJaBaRa Installation Effect
  1. Collecting Ca²+ (Calcium ion), Mg²+(Magnesium ion), such as scale generating ions dissolved in water onto cathode surface.
-Maintaining the concentration to below the solubility
-Preventing scale generation
    2.  Inhibits generation of microorganisms production by radical hydroxyl and chlorine
       - Inhibiting Slime
       - Inhibiting green algae
      ※ Radical hydroxyl group : Strong chemicals for oxidizing with non-toxic character from the known
 Substances (fluorine, ozone, chlorine)
  1. Anti-Corrosion
- Prevents corrosion by changing cooling water into alkalescent water
 
DaJaBaRa Expectation After Installation
1. Preventing and collecting various scales at the facility cooling water types.
2. Dajabara inhibits various microorganisms occurrence by generating hypochlorous acid (HOCL)
,operating the sterilizing effect.
3. No need to stop the equipment in operation in order to remove the scales in the cooling tower water system.
4. 5~10% energy savings by improving efficiency of the Heat Exchanger.
5. By decreasing coolant blowdown , water consumption can be reduced by 70~80%.
6. Reduction of the cost of disinfectants and micro-organisms inhibitor for cooling water cleaning.
 
image

image

image

País: South Korea
N º de Modelo: KMX-AO2601T
Precio FOB: Obtener el precio más reciente
Lugar de origen: Republic of Korea
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1
Detalle de embalaje: Standard Wooden Packaging
El tiempo de entrega: 15 to 20 days
Capacidad de suministro: 30
Tipo de pago: -
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Mr. MinSoo < KMX Co.,Ltd. >

quiero saber: