Precio FOB
Obtener el precio más reciente1500 ~ 1500 / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
1500 ~ 1500 / Set Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
1500 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
one shipment
El tiempo de entrega:
Within a week of placing the order
Capacidad de suministro:
1 Set per Week
Tipo de pago:
Other
Grupo de productos :
-
Persona de contacto Wang
Chengdu, Sichuan
During the design of building formwork and support system, the first thing to bear the brunt is to fully consider the self weight of the product itself, construction load and the self-sufficiency of concrete and the lateral pressure generated during pouring and tamping, so as to ensure that the building formwork support has sufficient bearing capacity and performance.
País: | China |
N º de Modelo: | - |
Precio FOB: | 1500 ~ 1500 / Set Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 1500 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | one shipment |
El tiempo de entrega: | Within a week of placing the order |
Capacidad de suministro: | 1 Set per Week |
Tipo de pago: | Other |
Grupo de productos : | - |