Precio FOB
Obtener el precio más reciente( Negotiable )
|- Minimum Order
País:
Hong Kong
N º de Modelo:
-
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
-
Detalle de embalaje:
Standard export package or as per customer's requirement.
El tiempo de entrega:
1. By air or sea 2. By express companies
Capacidad de suministro:
5000 per Week
Tipo de pago:
-
Grupo de productos :
Hong Kong
Persona de contacto Mr. Rocky
Chong Ming Bulding, 82 Cheung Sha Wan Road, Kowloon, HK
CNC turning mechanical parts
Item | Details |
Process |
CNC machining, CNC turning |
Material capabilities |
Stainless steel : **3, **4, **6, **2, etc Steel: Carbon steel/ die steel, etc Aluminum alloy: ***1, ***3, ***2, ***7, ***5, etc Brass alloy: ***2, ***4, H*9, H*2, etc Other materials are available |
Surface treatment |
Anodizing, Polishing, Powder coating, Passivation, Sandblasting, Nickal plating, Zinc plating, Chrome plating, Heat treatment, Oxidation |
Application |
Electronic, auto, electric appliance, electrical machine, toy, medical treatment, loudspeaker box, furniture and fitness equipment and other industries. |
Design | According to customer drawing or sample |
Equipment |
CNC punching machine, CNC milling machine, CNC turning machine, CNC machining center, Automatic lathe, Linear cutting, Grinding machine etc. |
Standard | JIS, DIN, ANSI, EN, etc. |
Tolerance | 0.**5mm - 0.*1mm |
Surface Roughness | Ra 1.6 *3.2 |
Software |
Auto CAD, Solid work, UG: PDF, DWG, DXF, IGS, STEP, SLDPRT |
Packaging |
Foam polybag + Outer -Standard Carton Box/Carton Box with Pallet + Stretch Film |
Delivery | ****5 days after receipt of customer's deposit |
Main markets | U.S.A, England, Spain, Germany, Italy, Switzerland, etc |
País: | Hong Kong |
N º de Modelo: | - |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | - |
Detalle de embalaje: | Standard export package or as per customer's requirement. |
El tiempo de entrega: | 1. By air or sea 2. By express companies |
Capacidad de suministro: | 5000 per Week |
Tipo de pago: | - |
Grupo de productos : | metal maching part |