Precio FOB
Obtener el precio más reciente600 ~ 700 USD / Ton
|5 Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
600 ~ 700 USD / Ton Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
600 per Ton
Cantidad de pedido mínimo:
5 Ton
Detalle de embalaje:
standards export package
El tiempo de entrega:
15 TO 20 days after receving deposit
Capacidad de suministro:
50000 Ton per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
-
China
Persona de contacto Mr. Pillar
Cangzhou Rongsheng, Cangzhou, Hebei
Cuplock Scaffolding
Product name | Cuplock scaffolding |
Components |
standard
,ledger, top cup, bottom cup, Ledger Blade |
Material | Q**5 |
Surface | galvanized, Hot dip galvanized, Painted |
color | red paint, blue paint, yellow paint, green paint, bright galvanized |
size |
Steel pipe
diameter is *8.3mm Thickness :2.*5/3.0/3.2/3.*5/3.5mm standard Length:0.5/1.0/1.5/2.0/2.5/3.0M Ledger length:0.6/0.9/1.0/1.2/1.5/1.8 |
usege | Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc |
Packing | Bulk or Bundle with steel strip |
País: | China |
N º de Modelo: | - |
Precio FOB: | 600 ~ 700 / Ton Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 600 per Ton |
Cantidad de pedido mínimo: | 5 Ton |
Detalle de embalaje: | standards export package |
El tiempo de entrega: | 15 TO 20 days after receving deposit |
Capacidad de suministro: | 50000 Ton per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |