Precio FOB
Obtener el precio más reciente3300 ~ 3350 USD / Metric Ton ( Negotiable )
|20 Metric Ton Minimum Order
País:
China
N º de Modelo:
23JGH090
Precio FOB:
3300 ~ 3350 USD / Metric Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
3300 per Metric Ton
Cantidad de pedido mínimo:
20 Metric Ton
Detalle de embalaje:
export packing
El tiempo de entrega:
about 21 days after the shipment
Capacidad de suministro:
50 Metric Ton per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
-
China
Persona de contacto Mr. Morris
No. 4, Wu Gong Road, Long Wu industrial park, Long Hua, Shenzhen, Guangdong
1. property: International Standard
2. more than *6
years'exprience in electrical silicon steel industry
3. material: excellent quality range of crgo silicon steel,
which are manufatured from high grade quality raw materials
4. mill: ISO ***1:***8
certified
5. thickness: 0.*3mm grade:
*3JGH**0
6. width: slit coils width less than **0mm, the width can be
customized as per our precious customers specfications
7. samples are available for these products, with sample
costs,shiping and taxes paid by the buyer
8. applicable: the various laminated silicon steel including
transformers, ballasts and power conditioners
stator and rotor laminated silicon steel for
the various motors for electrical machinery, genertators, fans,
ceiling fans, compressors and electric appliances
9. payment: L/C at sight
or *0% deposit *0% T/T before shipment
*0. the price valid for May
***2
*1. Export packing
One *0' container can load about ****4
metric tons
Each strip wrap by braid, then put on
pallet. One strip stack on another stack.
Then use thin iron strip to wrap the
strips, afterward, use stretch film to wrap the
strips.
País: | China |
N º de Modelo: | 23JGH090 |
Precio FOB: | 3300 ~ 3350 / Metric Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 3300 per Metric Ton |
Cantidad de pedido mínimo: | 20 Metric Ton |
Detalle de embalaje: | export packing |
El tiempo de entrega: | about 21 days after the shipment |
Capacidad de suministro: | 50 Metric Ton per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |