Precio FOB
Obtener el precio más reciente2600 ~ 2900 / Metric Ton
|1 Metric Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
2600 ~ 2900 / Metric Ton Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
2600 per Metric Ton
Cantidad de pedido mínimo:
1 Metric Ton
Detalle de embalaje:
-
El tiempo de entrega:
WITHIN 10 DAYS
Capacidad de suministro:
100 Metric Ton per Month
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Flora
Yichang, Hubei
Product Name
CPVC pipe fittings grade Compound for injection fittings
Technical Specification
Appearance: White powder
Chlorine content(%): 63-66
Volatility (%) ≤0.40
Screening rate (30mesh,%): ≥99
Heat decomposition temperature(°C): ≥120
Heat stability(s): ≥20
General Information
ED-Z500PF is chlorinated polyvinyl chloride compound used in a variety of industrial applications where a high functional temperature and resistance to corrosive chemicals are desirable. These cost-effective compounds combine high strength performance, high heat distortion temperature, chemical resistance, flame retardancy and low smoke generation. Key performance properties are optimized through the selection of appropriate additives to meet certain regulatory and performance requirements.
Application
ED-Z500PF is developed for the injection molding of fittings for water supply.
They are widely used to produce pipes fittings for conveying systems of cold and hot water, super clean water, drinking water, sewage, water processing, air-conditioning water in residential usage such as office buildings, education, healthcare, hospitality, mass transit, villa, pool and spa, etc.
Package, Storage & Transportation
N.W.25KG in plastic woven bag. Stored in the dry ventilated warehouse avoid light and rain. It is non-flammable and non-explosive. Handle and transport in accordance with general regulations.
País: | China |
N º de Modelo: | - |
Precio FOB: | 2600 ~ 2900 / Metric Ton Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 2600 per Metric Ton |
Cantidad de pedido mínimo: | 1 Metric Ton |
Detalle de embalaje: | - |
El tiempo de entrega: | WITHIN 10 DAYS |
Capacidad de suministro: | 100 Metric Ton per Month |
Tipo de pago: | - |
Grupo de productos : | - |