Precio FOB
Obtener el precio más reciente3 ~ 9 USD / Piece ( Negotiable )
|500 Piece Minimum Order
País:
China
N º de Modelo:
CTF
Precio FOB:
3 ~ 9 USD / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
3 per Piece
Cantidad de pedido mínimo:
500 Piece
Detalle de embalaje:
PE belt and wooden pallet
El tiempo de entrega:
15 days
Capacidad de suministro:
20000 Piece per Week
Tipo de pago:
T/T, L/C, Western Union
Grupo de productos :
-
Persona de contacto Neva
Shijiazhuang, Hebei
What's cooling tower fill?
Cooling Tower Fill is one of the most important components for
exchange of gas and water in cooling tower.
It is the major parts to improve the efficiency of cooling tower
and make sure the economy and safe
operation. With the development of the plastic industry,
counter-current tower drench water plastic
packing "S" shape ladder wave, inclined corrugated fills, which has
the heat dissipation, durable,good
performance, ventilated small resistance, based on the easy and
other advantages. It is widely used
in different types of large, medium, small, cooling
tower.
País: | China |
N º de Modelo: | CTF |
Precio FOB: | 3 ~ 9 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 3 per Piece |
Cantidad de pedido mínimo: | 500 Piece |
Detalle de embalaje: | PE belt and wooden pallet |
El tiempo de entrega: | 15 days |
Capacidad de suministro: | 20000 Piece per Week |
Tipo de pago: | T/T, L/C, Western Union |
Grupo de productos : | - |