Precio FOB
Obtener el precio más reciente78765 USD / ( Negotiable )
|1 Plant Minimum Order
País:
South Africa
N º de Modelo:
CGP-1
Precio FOB:
78765 USD / ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
78765
Cantidad de pedido mínimo:
1 Plant
Detalle de embalaje:
Built into container
El tiempo de entrega:
3 TO 4 Months
Capacidad de suministro:
1 Plant per Month
Tipo de pago:
Western Union
Grupo de productos :
-
South Africa
Persona de contacto Mr. Paul
Platina Cres, Springs, Other
This is a complete gold mining process built into a *0 foot shiping
container.
The plant can process between 3 and 5 tons of ore per hour.
Process- Ore is loaded on a feeder hopper where it falls onto a
conveyor which feeds a jaw crusher.
From the jaw crusher the ore falls into the hammer mill which mills
it down to*6mm then to a wet rod mill where it is milled down
to***0 micron.
This fine material slurry is then pumped onto a Ami-flo shaking
table through a cyclone to do a heavy-light split. The gold
concentrate from the Ami-Flow table is then gravity fed to a
Ami-Fin Micro Table.
The high gold concentrate is collected in a safe box where an
appointed person will take it to the leaching plant. After the
leaching process the fine gold dust is sent to the furnace to be
melted and moulded into a form.
País: | South Africa |
N º de Modelo: | CGP-1 |
Precio FOB: | 78765 / ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 78765 |
Cantidad de pedido mínimo: | 1 Plant |
Detalle de embalaje: | Built into container |
El tiempo de entrega: | 3 TO 4 Months |
Capacidad de suministro: | 1 Plant per Month |
Tipo de pago: | Western Union |
Grupo de productos : | - |