Precio FOB
Obtener el precio más reciente600 ~ 800 USD / Metric Ton
|10 Metric Ton Minimum Order
País:
China
N º de Modelo:
RP-1
Precio FOB:
600 ~ 800 USD / Metric Ton Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
600 per Metric Ton
Cantidad de pedido mínimo:
10 Metric Ton
Detalle de embalaje:
in bundle by 9 steel belt
El tiempo de entrega:
15~40 days
Capacidad de suministro:
50000 Metric Ton per Month
Tipo de pago:
T/T, L/C, Western Union
Grupo de productos :
Persona de contacto jane
Lishui Road, hangzhou, Hangzhou, Zhejiang
Common Carbon Steel
Rectangular Tube or Pipe for
Construction(*0x**0mm)
1. Material: ASTM A**0 Q**5 Q**5 Q**5 S**5JR, S**5JR,
etc.
2. Production Technique: ERW Welded
3. Specification: *0X*0mm~**0X**0mm
Thickness: 1.0mm~*8mm
Length: 6m or cut as request
Addition:
1: Anti-corrosion and high-temperature resistant with hot dipped
galvanizied coating or painting.
2: All the production process are made under the ISO***1: ***0
strictly
3: With BV certificate, PC certificate, ISO********0, SGS
inspection.
4. Standards: ASTM A**0, BS********5, GB/T********8, JIS***6,
GB/T********2
5. Packing: 1. Galvanized: Packed by steel strips
2. Black steel hollow: Packed by steel strips and
tarpaulin
3. Woven cloth with 7 slats
4. According to the requirements of customers
6. Usage: Mechanical & manufacture, Steel structure, Ship
building, Bridging, Automobile chassis, construction,
etc.
7. Main market: Middle East, South American, Africa, Asia and some
European country and America, Australia, etc.
8. Zinc coating(if): Pre-galvanized: *****0G/M2; Hot DIP
galvanized: ******0G/M2
9. Productivity: 6, **0 Metric Tons per Month
*0. Remark:
A. Payment terms: T/T, L/C
B. Terms of trade: FOB, CFR, CIF, DDP, EXW
C. Minimum order: 5 tons
D. Lead time: ***0 days.
País: | China |
N º de Modelo: | RP-1 |
Precio FOB: | 600 ~ 800 / Metric Ton Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 600 per Metric Ton |
Cantidad de pedido mínimo: | 10 Metric Ton |
Detalle de embalaje: | in bundle by 9 steel belt |
El tiempo de entrega: | 15~40 days |
Capacidad de suministro: | 50000 Metric Ton per Month |
Tipo de pago: | T/T, L/C, Western Union |
Grupo de productos : | steel pipe |