Precio FOB
Obtener el precio más reciente120 ~ 125 USD / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
120 ~ 125 USD / Set Obtener el precio más reciente
Lugar de origen:
china
Precio de pedido mínimo:
120 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
in carton or pallet
El tiempo de entrega:
1-7 days after we received your payment
Capacidad de suministro:
1000 Sheet per Month
Tipo de pago:
T/T, Western Union, Money Gram, PayPal
Grupo de productos :
-
China
Persona de contacto Nancy
Darbying or bull floating should be done immediately after
"screeding", or after the concrete has been tamped if tamping was
done.This process should be finished before excess moisture or
bleedwater appear on the surface.
The purpose of darbying or bull floating concrete is to level
ridges and fill voids left by the screeding operation. It
should
also slightly embed the coarse aggregate to make subsequent
finishing operations easier.
Be careful when using these tools not to close up or seal the
surface of the concrete, which may cause blistering or
scaling.
Use a bull float for areas too large to reach with a darby, though
it may produce a wavier surface.
País: | China |
N º de Modelo: | - |
Precio FOB: | 120 ~ 125 / Set Obtener el precio más reciente |
Lugar de origen: | china |
Precio de pedido mínimo: | 120 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | in carton or pallet |
El tiempo de entrega: | 1-7 days after we received your payment |
Capacidad de suministro: | 1000 Sheet per Month |
Tipo de pago: | T/T, Western Union, Money Gram, PayPal |
Grupo de productos : | - |