Precio FOB
Obtener el precio más reciente|
- Minimum Order
País:
China
N º de Modelo:
SCD200/200
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
-
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
-
Tipo de pago:
-
Grupo de productos :
-
Persona de contacto Mr. Scott
No.71 Wutaizha East Road, Jining, Shandong
The SCD**0/**0 construction elevator is driven by joggling of gear and rack, two drive systems establish in top of the cage, compared with the past three transmissions, it enlarged the power of electromotor and torque of the single speed reducer, reduced drive electromotor, thus increased the synchronism which the drive and the rack meshed, the effective solution three drive electromotor synchronized question, lengthened the drive service life; Reduced the noise in the cage and improves working conditions in the cage, it has facilitated the service and the maintenance. The electric cable pulley equipment may effective lengthen the electric cable the service life. It is suitable for the industry and civil and so on in the high-rise construction.
País: | China |
N º de Modelo: | SCD200/200 |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | - |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | - |
Tipo de pago: | - |
Grupo de productos : | - |