Precio FOB
Obtener el precio más reciente|
1 Unit Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1 Unit
Detalle de embalaje:
-
El tiempo de entrega:
-
Capacidad de suministro:
-
Tipo de pago:
L/C, T/T
Grupo de productos :
-
Persona de contacto Mr. Frank
shangjie, Zhengzhou, Henan
The bridge building crane for high speed railway uses full span method to construct bridge with span *0m,*4m and *2m, whole span girder weight **0t***0t, it is specially designed and made by ZZHZ .
Full span method means that girder carrier carries one whole span prefabricated box girder to the rear part of crane, then the bridge building crane lifts and puts it to the final position, and begins to install next span.
Main technical parameters
Product Model | HZQ**0 | HZQ**0 |
---|---|---|
Lifting Capacity (t) | **0 | **0 |
Max girder dimension(m) | *2.6×*3.4×3 | *2.6×8.4×3 |
Moving Speed (m/min) | **3 | **3 |
Trolley Moving Speed (m/min) | **3 | **3 |
Trolley lifting Speed (m/min) | **0.5 | **0.5 |
Trolley max lifting height(m) | 7 | 6.6 |
Girder transverse Trimming distance(mm) | ±**0 | ±**0 |
Girder Trimming speed(m/min) | **1 | **1 |
Tackle lifting weight(t) | *0 | *5 |
Min curve bridge radius(m) | ***0 | ***0 |
Power Required (kw) | **0 | **0 |
Out Dimensions (m) | *3.9×*3.5×*7.8 | *5.8×*1.*8×*1.8 |
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1 Unit |
Detalle de embalaje: | - |
El tiempo de entrega: | - |
Capacidad de suministro: | - |
Tipo de pago: | L/C, T/T |
Grupo de productos : | - |