Descripción del producto
Product Profile:
Tension Conveying Green Belt Building Machine production
line is mainly used in nylon belt, EP belt, layered cotton canvas
belt building and conveying belt rubberzing. The production line in
the building process, The blank in the control of magnetic powder
brake, then tension state assembly, the cloth guilding and coiling
the wrinkle device ensures the cloth not wrinkle, building
operation on both sides of the back and forth; material car can
manually adjust the width direction of the position;in the
tensioning roller device of the nearby set up an emergency stop
. The rotation speed manual control. All the electrical
configuration on the same side, cloth coiling roller can be
separated form, the production line can be two round-trip
lamination, tensioning roller in middle position of whole line.
|
DCS****0 |
DCS****0 |
DCS****0 |
DCS****0 |
Max Width of green belt(mm) |
***0 |
***0 |
***0 |
***0 |
Max Thickness of green belt(mm) |
*0 |
*0 |
*0 |
*0 |
Max diameter of reeled green belt(mm) |
***0 |
***0 |
***0 |
***0 |
Max weight of green belt (Ton) |
*0 |
*0 |
*0 |
*0 |
Max speed of green belt (m/min) |
***0 |
***0 |
***0 |
***0 |
Max thickness of rubber sheet(mm) |
***0 |
***0 |
***0 |
***0 |
Tension control mode |
Tension brake |
Tension brake |
Tension brake |
Tension brake |
Deviation correcting system |
Servo |
Servo |
Servo |
Servo |
Length of building platform(mm) |
***0 |
***0 |
***0 |
***0 |
Height of building platform (mm) |
**0 |
**0 |
**0 |
**0 |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee
the quality of outsourcing parts?
A: First choice more than
2 suppler by tender, There are strict system and process for
inspecting outsourcing parts. And there are outsourcing inspectors,
after inspection, qualified goods, labeling and storage. Not
qualified, return.
2. Q: Which brand of
electric part?
A: Use world famous
brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron,
Mitsubishi
4. Q: How to
control the quality?
A: There are
inspectors for inspecting equipment quality and performance, after
assembly, machine run continuously for at least *2 hours at one
time, Total running time should be not less than *8 hours.
About installation
1. Q: When the
guide engineer arrive at customer's factory?
A: If need
installation on site, engineer will arrive at factory within one
week after machine arrived at factory.
About after-sales service
1. Q: What is the
warranty time?
A: 2 years after
machine arrived at factory
2. Q: How to solve
the problem?
A: Within one hour
after getting customer' problem, inform the solution way, there
are three ways for different conditions. 1, Which can be solved by
phone or Email, it will be solved in two hours. 2. Which can be
solved by Remote Control, it will be solved within four
hours(machine is equipped by Remote Network Control Problem). 3.
Which need solve it on site, engineer arrive at factory within one
week(in the two years warranty date, engineer has the visa any time
of the country where the machine.
Tel:***************3
Fax:***************3
Cell:****************6
País: |
China |
N º de Modelo: |
ZLS
|
Precio FOB: |
58000 ~ 150000 / (Negociable)
Obtener el precio más reciente
|
Lugar de origen: |
China |
Precio de pedido mínimo: |
58000 |
Cantidad de pedido mínimo: |
1 Set |
Detalle de embalaje: |
Wood Carton |
El tiempo de entrega: |
30 days after delivery of the deposit |
Capacidad de suministro: |
15 Set per Month |
Tipo de pago: |
T/T, L/C |
Grupo de productos : |
- |