Precio FOB
Obtener el precio más reciente1500 ~ 20000 USD / Set ( Negotiable )
|1 Set Minimum Order
País:
China
N º de Modelo:
ASTE-FV
Precio FOB:
1500 ~ 20000 USD / Set ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
1500 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
Iron Frame
El tiempo de entrega:
45--60 working days
Capacidad de suministro:
30 Piece per Month
Tipo de pago:
PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Grupo de productos :
Persona de contacto Robert
No.71 Kaiyuan, Jinan, Shandong
The fermentation tank adopt cooling jacket and two-stage cooling refrigerant control mode at the cone and cylinder. So such design and cooling method to control the flow of the cooling liquid state in fermentation tank by the size of the two-stage cooling refrigerant flow. It will improve heat transfer efficiency and cooling rate, faster cooling, and reduce cooling costs and high economic efficiency equipment commercial operation.
Technical data of fermenters | ||||||||
Items | Total Volume/L | ID/mm | OD/mm | Height/mm | Cooling area | Weight/kg | Thickness/mm | Manhole |
*0L Fermenter | *0 | **0 | **0 | ***0 | 0.*7 | *5 |
IN:
2.0 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 0.5 | *5 |
IN:
2.5 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 0.8 | **0 |
IN:
2.5 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1 | **5 |
IN:
2.5 OUT:2 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1.*5 | **5 |
IN: 3 OUT:2 |
Top or Side |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1.6 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 2.8 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 3.3 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 3.5 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 |
País: | China |
N º de Modelo: | ASTE-FV |
Precio FOB: | 1500 ~ 20000 / Set ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 1500 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | Iron Frame |
El tiempo de entrega: | 45--60 working days |
Capacidad de suministro: | 30 Piece per Month |
Tipo de pago: | PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Grupo de productos : | Beer Brewing Equipment |