Precio FOB
Obtener el precio más reciente710 / Ton
|50 Ton Minimum Order
País:
China
N º de Modelo:
14000 Tons
Precio FOB:
710 / Ton Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
710 per Ton
Cantidad de pedido mínimo:
50 Ton
Detalle de embalaje:
pipes would be packed in bundles with strong steel strip and about 1.5-2T/bundle, or suitable for con
El tiempo de entrega:
15 days to 30 days, or according to your requireme
Capacidad de suministro:
5000 Ton per Month
Tipo de pago:
T/T, L/C, Western Union
Grupo de productos :
Persona de contacto Liu
Xintai, Shandong
Product Name | seamless steel pipes for boiler |
Standard | DIN*******9 JISG******8 JISG******8 ASTMA**3/A**3m |
Main Material | *0#, *0#, *0MnDG, *5MnDG, *5CrMoG |
Section Shape | Round |
OD | *****0mm |
Wall Thickness | ****0mm |
Origin | China(Mainland) |
Production Process | Cold Rolled, Hot Rolled |
Uses | Petroleum, Chemical, Electricity, Boiler |
Packaging | Normal standard as the requirement of the customer |
MOQ | *0 Tons |
Trade Terms | FOB |
Payment Terms | T/T, L/C |
Supply Capacity | ****0 Tons per month |
Shipment Time | Shipment shall be made within *0days after the contract confirmed |
Delivery Time | Within *0 days after the order confirmed |
País: | China |
N º de Modelo: | 14000 Tons |
Precio FOB: | 710 / Ton Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 710 per Ton |
Cantidad de pedido mínimo: | 50 Ton |
Detalle de embalaje: | pipes would be packed in bundles with strong steel strip and about 1.5-2T/bundle, or suitable for con |
El tiempo de entrega: | 15 days to 30 days, or according to your requireme |
Capacidad de suministro: | 5000 Ton per Month |
Tipo de pago: | T/T, L/C, Western Union |
Grupo de productos : | steel pipe |