Precio FOB
Obtener el precio más reciente1100 ~ 1680 USD / Ton ( Negotiable )
|1 Ton Minimum Order
País:
China
N º de Modelo:
GYBJ 16-d4
Precio FOB:
1100 ~ 1680 USD / Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
Foshan, china
Precio de pedido mínimo:
1100 per Ton
Cantidad de pedido mínimo:
1 Ton
Detalle de embalaje:
Bundle, Package Box, Pallet, Container
El tiempo de entrega:
Generally 5-30 days, according quantity
Capacidad de suministro:
80000 Ton per Year
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Ms. Joyce
Gong Ye Da Dao, Foshan, Guangdong
Our Products
Product Name: | Intelligent full steel modular attached type lifting scaffold | Linear(Horizontal)span: | ≤7m |
Scaffolding Part Type: | Scaffolding Frames | Broken line or curve span: | ≤5.4m |
Move Method: | Attached Lifting Scaffolding | Horizontal Cantilever plate length: | ≤2m and no more than 1/2 span |
Construction Properties: | Building Scaffold | Frame full height *support span: | ≤**0 |
Application: | High-rise/High Altitude building construction/Formworking supporting | Lifting Speed: | *2cm/Min |
Certification: | ISO***1,SGS | Anti-falling breaking distance: | ≤ *0mm |
Structural Style: | Integrated | Synchronization error of adjacent positions: | ≤ *0mm |
Colour: | Different colour available | Working load: | ≤ 2.0KN/, 3 floors & ≤ 3.0KN/, 2 floors |
Surface Treatment: | Painted | Lifting load: | ≤ 0.5KN/, 2 floors |
Supporting Mode: | Wall climbing/ Hanging/ Attaching Scaffolding | Rate power of hoist: | **0W |
Specification: | customized | Rate load of hoist: | 7.5T |
Distance from wall: | *0cm | Screen windshield coefficient: | 0.*2 |
Climbing Scaffolding Unit Height: | ≤*5m(no more than 5 floors) | ||
Climbing Scaffolding Unit Width: | 0.7m |
País: | China |
N º de Modelo: | GYBJ 16-d4 |
Precio FOB: | 1100 ~ 1680 / Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Foshan, china |
Precio de pedido mínimo: | 1100 per Ton |
Cantidad de pedido mínimo: | 1 Ton |
Detalle de embalaje: | Bundle, Package Box, Pallet, Container |
El tiempo de entrega: | Generally 5-30 days, according quantity |
Capacidad de suministro: | 80000 Ton per Year |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Scaffold Accessories |