Precio FOB
Obtener el precio más reciente10000 USD / Set
|1 Set Minimum Order
País:
China
N º de Modelo:
DEYI aac machine
Precio FOB:
10000 USD / Set Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
10000 per Set
Cantidad de pedido mínimo:
1 Set
Detalle de embalaje:
in bulk
El tiempo de entrega:
30 days
Capacidad de suministro:
100 Set per Year
Tipo de pago:
T/T, L/C
Grupo de productos :
Persona de contacto fay
Jingnan san road, Zhengzhou, Henan
China best aac block machine
AAC block machine/aac block equipment
We are a leading manufacturer of block making machineryin China with a history of *5 years. We have several kinds of AAC block production lineto make different kinds of bricks/blocks with different capacities.
Our air turnover AAC production line is importing German advanced equipment, through digesting, design and more perfect, our production line is popular in home and oversea .Our equipment is advanced, we use Aerial tumbling cutting units .PLC automatic ingredient, complete electric control system .It will help you improve efficiency and save cost.
The whole aac production lineincluding ingredients, mixing, pouring, preliminary maintenance, cutting, autoclaved maintenance .
1.Raw material preparation and storage
(equipment: jaw crusher,Bucket elevator ,silo,Electronic
Vibrating Feeder,Ball Mill ,mould and so on )
Fly ash (or sand, stone) by electromagnetic vibrating feeder and
belt into the ball mill, the fly ash( after grinding fine sand,
stone) with fly ash pump were sent to the pulp cans of
storage.
Lime by electromagnetic vibrating feeder and belt into the jaw
crusher are broken, broken by dou type of lime hoist into lime
storage and then by screw conveyor into fine after grinding ball
mill, material is screw conveyor, dou type hoist into powder
batching.
Chemicals in a certain proportion after artificial measurement,
made certain density solutions, into in the tank is stored.
Aluminium by aluminum library shipped to the production workshop,
electric hoist ascent to ingredients floor on the second floor
combine ingredients in blender filled quantitative water, stir
into aluminum powder suspending liquid.
2.Ingredients, mixing, pouring
(equipment: screw conveyer,silo,Aluminum mixer,Pouring
machine,control system and so on)
Fly ash slurry or sand slurry will be measured by slurry
electronic measurement in ingredients center .Lime, cement are
sent by spiral feeder to measure.Then all the raw materials will
be sent to pouring mixer machine by feeding equipment for
high-speed mixing,All measurement through PLC automatic
centralized control,to assure accuracy and continuity of
measurement.After a few minutes,then the arm of casting machine
starts pouring material to the mold box.
3.Static stop maintenance
(equipment: Static stop maintenance room)
After pouring,mould should be sent to static stop maintenance
room for preliminary condensation,
The temperature need *0 to *0℃ for 1.**2 hours.(according to
the geographical advantages, can discharge the process).
4.Cutting
(equipment: aac cutting machine,air compressor,Recycling
mixer)
AAC blocks Cutting :Turns over the hoisting mechanisms airborne
to turn over together the mold belt body on *0 degree laying
aside cutting car, the drawing of patterns keeps the body
together with the side bar cuts on the car, cutting car to make
the power by the electrical machinery to walk, completes
longitudinal cutting, the milling, level cutting through the
slitting installment; Cutting car continues to walk after the
infeed set-up central location stop, the infeed set-up starts,
transverse cutting vertical undercuts from the top downward
completes the across cutting; Cutting car to walk again to the
grouping hoisting mechanisms place (side bar hangs continually)
by the grouping hoisting mechanisms the body to steams raises on
the car, cutting car to return to the initial position to carry
on the next cutting circulation.
Stripping the given photo-cell and lateral plate stay together
with cars, Cutting edge horn produce given photo-cell and waste,
the screw conveyor to cutting waste pulp by stirring loops made
waste water machine, the slurry, stay ingredients when used.
5.Coding and autoclave
(equipment: steaming larry,windlass,autoclaves,boiler and so
on)
Finished grouping steaming larry will be sent to autoclaves by
the slowly windlass,after ***0hours blocks in autoclaves ,the
finished blocks will be take out with the windlass behind the
autoclave.
A semi-finished crane hoist will send the blocks with side panel
to conveying groove,then the the blocks would be sent to wooden
pallets in the packing line by a finished crance hoist. The
worker or automatic packing machine will pack the blocks ,the
they are in finished goods yard.The empty side panel return and
go on its cycle after cleaning.
País: | China |
N º de Modelo: | DEYI aac machine |
Precio FOB: | 10000 / Set Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 10000 per Set |
Cantidad de pedido mínimo: | 1 Set |
Detalle de embalaje: | in bulk |
El tiempo de entrega: | 30 days |
Capacidad de suministro: | 100 Set per Year |
Tipo de pago: | T/T, L/C |
Grupo de productos : | aac block machine |