Precio FOB
Obtener el precio más reciente700 ~ 1000 / Metric Ton
|7 Metric Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
700 ~ 1000 / Metric Ton Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
700 per Metric Ton
Cantidad de pedido mínimo:
7 Metric Ton
Detalle de embalaje:
wooden package and iron package or client`s requirement
El tiempo de entrega:
25-30 days
Capacidad de suministro:
1000 Metric Ton per Month
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto vickey
Cangzhou, Hebei
1.Supply to USA,Europe,Asia and Austrilia
2.Matrial:*5Mn,*0SI2MN(SUP6),*5CrMnA(sup9),*0CrMnA(SUP9A),*0CRVA(SUP*0)
3.Professional Perfomance Auto parts supplier
4.Ford Engines
Specifications
Material: Sup7,Sup9,Sup9A,Sup*1,Sup*1A,*0CrV4,*0Si2Mn
Position: Rear,front,sub
Delivery: ****5days
Certificate: ISO***1:***0
Our company is specialized in all types of leaf springs manufacturing as well as since ***5.
All products are exported to overseas throughout over *0 countries terms of Asia, Mid-east, Euro and North-America etc.We can produce over ****0tons per year with general capacity
Controlling all of products is a certified ISO ***1:***0 System.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in *4 hours.
4. after sending, we will track the products for you once
every two days, until you get the products. When you got
the
goods, test them, and give me a feedback.If you have any
questions about the problem, contact with us, we will
offer
the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and
brown cartons. If you have legally registered
patent,
we can pack the goods in your branded boxes after getting
your authorization letters.
Q2. What is your terms of payment?
A: T/T *0% as deposit, and *0% before delivery. We'll show
you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take *0 to *0 days after receiving
your advance payment. The specific delivery time
depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical
drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in
stock, but the customers have to pay the sample cost
and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have **0% test before delivery
Q8: How do you make our business long-term and good
relationship?
A:1. We keep good quality and competitive price to ensure
our customers benefit ;
2. We respect every customer as our friend and we sincerely
do business and make friends with them,
no matter where they come from.
País: | China |
N º de Modelo: | - |
Precio FOB: | 700 ~ 1000 / Metric Ton Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 700 per Metric Ton |
Cantidad de pedido mínimo: | 7 Metric Ton |
Detalle de embalaje: | wooden package and iron package or client`s requirement |
El tiempo de entrega: | 25-30 days |
Capacidad de suministro: | 1000 Metric Ton per Month |
Tipo de pago: | L/C, T/T |
Grupo de productos : | leaf spring |