Precio FOB
Obtener el precio más reciente2399 ~ 19999 /
|1 Piece Minimum Order
País:
China
N º de Modelo:
BFC-10KW
Precio FOB:
2399 ~ 19999 / Obtener el precio más reciente
Lugar de origen:
china
Precio de pedido mínimo:
2399
Cantidad de pedido mínimo:
1 Piece
Detalle de embalaje:
Export package
El tiempo de entrega:
7~30 working days
Capacidad de suministro:
100 Piece per Month
Tipo de pago:
T/T
Grupo de productos :
-
Persona de contacto Allen
Qingdao, Shandong
Wind turbine transport costs account for a substantial part of the cost of wind power generators, wind generators in operation in the process of maintenance and has plagued the user's problem, not only the high cost, and extremely inconvenient. Now in the market mainstream tower is a kind of cable type tower, its advantages can be manually installed, defect is covers an area of big, not beautiful; Additionally one kind is the taper tower, it has the advantage of beautiful, strong, but it must use the crane to install, and inconvenient maintenance, greatly increased the use cost of users, in the developed world sometimes annual maintenance cost is almost the value of the tower.
País: | China |
N º de Modelo: | BFC-10KW |
Precio FOB: | 2399 ~ 19999 / Obtener el precio más reciente |
Lugar de origen: | china |
Precio de pedido mínimo: | 2399 |
Cantidad de pedido mínimo: | 1 Piece |
Detalle de embalaje: | Export package |
El tiempo de entrega: | 7~30 working days |
Capacidad de suministro: | 100 Piece per Month |
Tipo de pago: | T/T |
Grupo de productos : | - |