Precio FOB
Obtener el precio más reciente400 ~ 550 USD / Metric Ton ( Negotiable )
|20 Metric Ton Minimum Order
País:
China
N º de Modelo:
light steel rails
Precio FOB:
400 ~ 550 USD / Metric Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
400 per Metric Ton
Cantidad de pedido mínimo:
20 Metric Ton
Detalle de embalaje:
standard export seaworthy packing
El tiempo de entrega:
10-25days
Capacidad de suministro:
1000 Metric Ton per Day
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Jennifer
Zhengzhou, Henan
Zhongxiang Steel Group was founded in ***7. With nearly *0 years'
efforts, we have developed into a large manufacturing, processing
and distribution centre in Henan, China. Our main products are
steel rails and accessories, mine support products and accessories.
We have a range of rails with JIS, UIC, DIN, ASTM, BS and GB
standards.
Any rails you need, please contact me.
Type | Model | Materials (Steel Grade) | Standard of Products | Theory Weight (kgs/M) |
Length (M) |
Packed In Bundle With Iron Wire (pcs/bundle) |
Light Rail | 4KG | Q**5 | Q/YYG*******8 | 4 | 6,8,9,*0 | *5 |
8KG | Q**5 | Q/YYG*******8 | 8.*2 | *5 | ||
*2KG | Q**5 | GB*******9 | *2.2 | *6 | ||
*5KG | Q**5/*5Q/*0Q | GB*******9 | *5.2 | *8 | ||
*8KG | YB*****3 | *8.*6 | *1 | |||
*2KG | GB*******9 | *2.3 | *1 | |||
*4KG | Q/YYG*******8 | *4.*6 | *1 | |||
*0KG | GB*******9 | *0.1 | *5 | |||
Heavy Rail | *8KG | U*1Mn/U*1MnX | GB******1 Q/YYG*******8 | *8.**3 | *2,*2.5 | *0 |
*3KG | *4.**3 | *0 | ||||
*0KG | *1.**4 | *0 | ||||
Crane Rail | QU*0 | U*1Mn | YB/T******3 | *2.8 | *2,*2.5 | *0 |
QU*0 | *3.*9 | *0 | ||||
QU**0 | *8.*6 | 5 | ||||
QU**0 | **8.1 | 5 |
País: | China |
N º de Modelo: | light steel rails |
Precio FOB: | 400 ~ 550 / Metric Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 400 per Metric Ton |
Cantidad de pedido mínimo: | 20 Metric Ton |
Detalle de embalaje: | standard export seaworthy packing |
El tiempo de entrega: | 10-25days |
Capacidad de suministro: | 1000 Metric Ton per Day |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |